My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2021-02-22
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2021-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 3:18:13 PM
Creation date
2/22/2021 3:14:43 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 rr <br /> Intake & Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT 2(o2 25 <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> ❑ Route to Commercial Building ❑ Attach to Project No. <br /> ❑ Route to Residential Building ❑ Route to Historic Reviewer <br /> ❑ Make this a "W"Permit ❑ OK to Route to Other Departments <br /> Bldg/TI/Addn/Rem Size ❑ Hold in Planning File Drawer <br /> Garage/Accessory Struct. Size Zone <br /> Number of Stories Overlay/Agreement <br /> Basement ❑No ❑Yes , Fin/Unfin Nonresidential Use <br /> Type of Construction Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: <br /> Occupancy Load Total No. of Dwelling Units: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not Req'd Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Reason Sprinklers Required: "In Lieu" Fee: Type: Amount$ <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd School Impact Fee: Total $ <br /> Reason Fire Alarm Required: Calculated: Credit•' <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No El Everett School Dist ❑Mukilte• S ` "list <br /> Add]RCW 64.55 docs required prior to final? ❑Yes ❑No Additional Notes: <br /> VALUATION CALCULATION: Total$ <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Intake OK by: Date: <br /> Additional Notes: Intake Comments: PW Worksheet Needed if: <br /> 1 _,t, <br /> �Q� °❑Sys Dev Eval ❑Traffic Mit Eval <br /> �( ` �� �� (��Y I❑Site Work or Drainage Proposed <br /> Approved By: Date: ` _ [❑Backflow Prevention for high hazard: <br /> ;(dental,medical,animals,mortuary,hospital, <br /> ;supportive housing) <br /> FIRE DEPARTMENT ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: ❑ This Permit is Approved by Public Works <br /> ❑ See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: 0 A Separate PW Permit is Required (Permit#: PW ) <br /> ❑ Review of As-Built Plans IRE FEE AND ❑ Is located in this folder <br /> ❑ Minimal or No Fire Scope- O FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> ❑ Review/ Inspection Scope-ADD FIRE FEE ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Approved By: Date: ❑ Public Works has no scope---PW Not Required <br /> Additional Notes: <br /> ELECTRICAL <br /> Additional Notes: <br /> Approved By: Date: Approved By: Date: <br /> 7/7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.