Laserfiche WebLink
IF IN DOUBT ASK Do not scale %iv <br /> AI dimensions in inches Ell <br /> • <br /> Do not manually alter CAD d • Inas <br /> Iconic Marker Spine <br /> Nominal weight 7501bs <br /> communitytransit \A <br /> 1.1 <br /> Power supply cable from PUD to route Position items in accordance with site plan drawings <br /> r up through base plate to metering unit <br /> oP. B 03.01.10 Record Drawing Revision by Otak <br /> -up through access hole Date Revision <br /> ll / <br /> Departure Column <br /> 0 / Nominal weight 4701bs <br /> 111 <br /> 1:] Center Column <br /> 4 holding down bolts per spine----\ Nominal weight 4701bs <br /> • \ 4 holding down bolts per column <br /> • <br /> Approach Column <br /> /Nominal weight 4701bs <br /> / . <br /> '\ / Qty. <br /> Power and communication cables enter \ X <br /> at the base of the center columm '\ Material <br /> X <br /> NOTE '\ Finish <br /> The main power cable is routed from the PUD Meter _X <br /> located in Iconic Marker — there is also a returning Works Order No. <br /> power cable to supply the lamps of the Iconic Marker X <br /> \ Project <br /> Swift BRT Shelter <br /> Client <br /> Community Transit <br /> Title <br /> \ Shelter Assembly Sequence <br /> Notes Scale Date <br /> II <br /> X 03.07.08 <br /> This sequence of drawings shows one possible sequence for assembly of the CT bus shelter this is not definative and should not be considered a method statement. Drawn Checked <br /> KNB X <br /> For the Iconic Marker Spine shown on this sheet refer to drawings:TEL A264 10 001 sheets 1 to 4 for assembly details Drawing no. Rev <br /> TEL A264 00 520 B <br /> Sheet 1 of 8 <br /> x ANSI BJ <br />