Laserfiche WebLink
INSPECTION REPORT <br />Date _ Permit:_ <br />o ctor: <br />Owner <br />Site Addre <br />T PE OF INSPECTION REQUESTED <br />PIE <br />TRI AL <br />BUI <br />MECHANICAL <br />PLUMBING <br />❑ Temp Se ice <br />❑ ER ground <br />❑ Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Groundw rk <br />noting <br />❑Rough In <br />❑Rough In <br />❑Slab/Con uit <br />Foundation <br />❑Ceiling Grid <br />❑Ceiling Grid <br />❑ Rough In <br />Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑ Service <br />Framing <br />❑ Rooftop Units <br />❑ Water Service <br />❑ Grounding <br />Insulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Ceiling Grid <br />Drywall Nailing <br />❑Plumbing Final <br />❑ Electrical Final <br />❑ hear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ oof Nailing <br />❑ Rough In/Service <br />Hot Water Tank <br />❑ Footing drains <br />❑ C iling Grid <br />❑ Refrigeration <br />❑ Rough in <br />❑ Roof drains <br />❑ B ilding Final <br />❑ Gas Pipe Final <br />❑ HWT Final <br />OTHER OR CONSULTATION: <br />❑ APPROVAL ❑ P RTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ C RRECTION REQUESTED ❑ <br />K FOR C.O. ❑ VI LATION <br />NABLE TO PERFORM INSP CTION: <br />ALL (425) 257-8881 FOR RE SPECTION _ 24 hour notice required <br />tl <br />Inspector: Date: 1 `' `--,' <br />EIR (10/06) ATABAR, INC. <br />