Laserfiche WebLink
4117r <br /> WAC 296-46B-900: ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900, If plan review is <br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> * If item (a)-(ii, iii, or v)is selected, the work must also comply with section(a)-(vii). See arrow flow chart below. <br /> (3)Electrical plan review. <br /> I (a)Electrical plan review is not required for: <br /> 0 (i)Low voltage systems; <br /> 4--E (II)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the project's distribution system <br /> does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2; or <br /> (C)A required fire pump system. <br /> 4-41 (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700,12(F); <br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517,2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less, <br /> (vi)Electric power production source(s)such as solar photovoltaic, fuel cell, or wind electric system(s)with a total <br /> rating of 9600 watts or less. <br /> (vii)For installations in(a)(ii),(iii), and(v)of this subsection to be considered,the following must be available <br /> to the electrical inspector before the work is Initiated: <br /> (A)A clear and adequate description of the project's scope: <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed:and <br /> (0)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply, <br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or <br /> Li physicians office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii), <br /> Er-- (b)Electrical plan review is required for all other new or altered electrical projects in educational,institutional,or health care <br /> I occupancies defined in this chapter. <br /> (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table 900-1 Table 900-2 <br /> Health or Personal Care Facilities Educational and Institimopat Facilities Places of Assembly,or Other Facilttles <br /> Health or Personal Cara ciit I Plan Review <br /> Ediatational,Institutional,or —Plan Review <br /> Type Required <br /> Other auiity Types Required <br /> Yes <br /> riCINVitrAn Etc,catona: Yes <br /> ca'e nstturc,-,a <br /> YeS <br /> assnsied ,ty <br /> iwonosrr,nospita Yes Notes to Tables 900-1 and 980-2_ <br /> psycovat,,c hospital 'tes °;„4.city as.th:>n Zed.to do e,ect, tr,spect>onS <br /> vlaterruty home yes ris:Fy require pi an re ,, onad :y typeS nod <br /> Arnor ary fc ty "yes reviewed by the,:es23- re,--°, <br /> ot,-4 aysit climc its <br /> .eet ak veanyvislacNry <br /> i'.rhah:ea ser, 'a:,<t) <br /> AMA:,eS,6tritu8 itation 'Y8S PERMIT 4 Page 2-Plan Review <br /> center <br />