4117r
<br /> WAC 296-46B-900: ELECTRICAL PLAN REVIEW
<br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to(a)to
<br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900, If plan review is
<br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided
<br /> with this permit application.
<br /> * If item (a)-(ii, iii, or v)is selected, the work must also comply with section(a)-(vii). See arrow flow chart below.
<br /> (3)Electrical plan review.
<br /> I (a)Electrical plan review is not required for:
<br /> 0 (i)Low voltage systems;
<br /> 4--E (II)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project;
<br /> (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder
<br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder.
<br /> (iv)Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the project's distribution system
<br /> does not include:
<br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F);
<br /> (B)An essential electrical system defined in NEC 517.2; or
<br /> (C)A required fire pump system.
<br /> 4-41 (v)Modifications to existing electrical installations where all of the following conditions are met:
<br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed
<br /> 250 volts or for lighting circuits not exceeding 277 volts to ground;
<br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700,12(F);
<br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517,2;
<br /> and
<br /> (D)Service or feeder load calculations are increased by 5%or less,
<br /> (vi)Electric power production source(s)such as solar photovoltaic, fuel cell, or wind electric system(s)with a total
<br /> rating of 9600 watts or less.
<br /> (vii)For installations in(a)(ii),(iii), and(v)of this subsection to be considered,the following must be available
<br /> to the electrical inspector before the work is Initiated:
<br /> (A)A clear and adequate description of the project's scope:
<br /> (B)A load calculation(s);
<br /> (C)What the load changes are, providing both before and after panel schedules as needed:and
<br /> (0)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is
<br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection
<br /> for that supply,
<br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or
<br /> Li physicians office where patients are not regularly kept as bed patients for twenty-four hours or more, per section
<br /> (1)(c)(xii),
<br /> Er-- (b)Electrical plan review is required for all other new or altered electrical projects in educational,institutional,or health care
<br /> I occupancies defined in this chapter.
<br /> (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun.
<br /> Table 900-1 Table 900-2
<br /> Health or Personal Care Facilities Educational and Institimopat Facilities Places of Assembly,or Other Facilttles
<br /> Health or Personal Cara ciit I Plan Review
<br /> Ediatational,Institutional,or —Plan Review
<br /> Type Required
<br /> Other auiity Types Required
<br /> Yes
<br /> riCINVitrAn Etc,catona: Yes
<br /> ca'e nstturc,-,a
<br /> YeS
<br /> assnsied ,ty
<br /> iwonosrr,nospita Yes Notes to Tables 900-1 and 980-2_
<br /> psycovat,,c hospital 'tes °;„4.city as.th:>n Zed.to do e,ect, tr,spect>onS
<br /> vlaterruty home yes ris:Fy require pi an re ,, onad :y typeS nod
<br /> Arnor ary fc ty "yes reviewed by the,:es23- re,--°,
<br /> ot,-4 aysit climc its
<br /> .eet ak veanyvislacNry
<br /> i'.rhah:ea ser, 'a:,<t)
<br /> AMA:,eS,6tritu8 itation 'Y8S PERMIT 4 Page 2-Plan Review
<br /> center
<br />
|