Laserfiche WebLink
INSPECTION REPORT <br /> (/, ,/.1„.1:w.„, <br /> Date t 1�A' I Permit: %\1 O —0730 <br /> —r <br /> Contractor: 'fit , \\aktX <br /> Owner: — -eo .-- <br /> Site Address: La000 /3:0 _ 3 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pf Fin ❑HWT Final <br /> OTHER OR CONSULTATION: jeI t ItA^L S)il .,CGl r- <br /> ❑ APPROVAL TIAL APPROVAL INAL APPROVAL THI RMIT <br /> ❑ OK FOR T.C.O. COR CTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> � 2P 2 v itti -2-t -J--- <br /> 1 <br /> 14/71 ) 1 <br /> 1 a v?--) i/1 j k <br /> c ° gInspector: e4. Date: <br /> EIR(10/06) DATABAR,INC. <br />