Laserfiche WebLink
INSPECTION REPORT <br /> 2 <br /> �x - Date ----- `� Permit: 2:A�� 7'� 0__ <br /> Contractor: ` jam - <br /> Owner: �^ <br /> Site Address: l0cco 2_3 L. J <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑S uctural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building� Final �C❑\� (Gas Pipe Final ,,� El HWT Final <br /> OTHER OR CONSULTATION: !EJ _ '# S__ <br /> ❑ APPROVAL TIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> • OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 E ECTION-24 hour notice required <br /> F-I <br /> S-rU 12 A'Cr&`_ N Ss A-12 <br /> �o : S f fC(`f 1 Ai vtezi 0 Ai <br /> c. <br /> u <br /> Inspector:_ D , F t.-- Date: 42.. /41-/7 <br /> EIR(10/06) DATABAR,INC. <br />