My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 6/20/2020
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Military Dept 6/20/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 9:39:03 AM
Creation date
2/24/2021 11:22:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
6/20/2020
Council Approval Date
5/20/2020
End Date
5/22/2024
Department
Fire
Department Project Manager
Brent Stainer
Subject / Project Title
COVID-19 Federal Disaster Declaration Grant
Tracking Number
0002787
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
Document Relationships
Washington State Military Department 4/25/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Small Project Payments: Payments are made for all small projects to the SUBRECIPIENT upon <br /> submission and approval of an A19-1A State of Washington Invoice Voucher to the DEPARTMENT, <br /> after FEMA has approved funding through approval of Project Worksheets. <br /> b. Progress Payments: Progress payment of funds for costs already incurred on large projects minus <br /> 10 percent retainage may be made to the SUBRECIPIENT upon submission by the <br /> SUBRECIPIENT of an A19-1A State of Washington Invoice Voucher, a letter of request, and a <br /> spreadsheet identifying the claimed costs supporting the payment request and approval by the <br /> DEPARTMENT. <br /> c. Improved Projects: Payments on improved projects (capped project) will be pro-rated based upon <br /> the percentage of the project that is funded under this disaster grant to the overall project cost. This <br /> percentage will be identified when the first payment on the improved project is made. Progress <br /> payments will be made as outlined above in Section B. <br /> d. Final Payment: Final Payment on a large project will be made following submission by the <br /> SUBRECIPIENT of a certification of completion on the STATEMENT OF DOCUMENTATION / <br /> FINAL INSPECTION REPORT form upon completion of project(s), completion of all final <br /> inspections by the DEPARTMENT, and final approval by FEMA. Final payment on a large project <br /> will include any retainage withheld during progress payments. Final payments may also be <br /> conditional upon financial review, if determined necessary by the DEPARTMENT or FEMA. <br /> Adjustments to the final payment may be made following any audits conducted by the Washington <br /> State Auditor's Office, the United States Inspector General or other federal or state agency. <br /> e. The SUBRECIPIENT is eligible to receive federal PA Management Costs up to 5 percent of the <br /> total award amount for each Subrecipient at the time of its request. PA Management Costs <br /> includes any of the following when associated with the PA portion of a major disaster or emergency: <br /> Indirect costs, direct administrative costs, and other administrative expenses associated with a <br /> specific project. Documentation is required to substantiate the eligibility of management activities <br /> and associated costs in accordance with PA Management Costs Interim Policy — Standard <br /> Operating Procedures. <br /> f. All payment requests shall be made on an A19-1A form, State of Washington, Invoice Voucher. <br /> Payments will be made by electronic fund transfer to the SUBRECIPIENT's account. <br /> g. Federal funding shall not exceed the total federal contribution eligible for Public Assistance costs <br /> under Presidential Disaster Declaration number FEMA-4481-DR-WA. <br /> h. For state agencies, the DEPARTMENT will, through interagency reimbursement procedures, <br /> transfer payment to the SUBRECIPIENT. Payment will be transferred by journal voucher to Agency <br /> No. , Accounting Fund No. <br /> i. Within the total Grant Agreement Amount, travel, sub-contracts, salaries, benefits, printing, <br /> equipment, and other goods and services will be reimbursed on an actual cost basis unless <br /> otherwise provided in this Agreement. <br /> j. For travel costs, SUBRECIPIENTs shall comply with 2 CFR 200.474 and should consult their <br /> internal policies, state rates set pursuant to RCW 43.03.050 and RCW 43.03.060 as now existing or <br /> amended, and federal maximum rates set forth at http://www.gsa.gov, and follow the most <br /> restrictive. <br /> k. If travel costs exceed set state or federal limits, travel costs shall not be reimbursed without written <br /> approval by DEPARTMENT Key Personnel. <br /> I. Receipts and/or backup documentation for any approved items that are authorized under this <br /> Agreement must be maintained by the SUBRECIPIENT consistent with record retention <br /> requirements of this Agreement, and be made available upon request by the DEPARTMENT, and <br /> local, state, or federal auditors. <br /> m. All work under this Agreement must end on or before the Grant Agreement End Date, and the final <br /> reimbursement request must be submitted to the DEPARTMENT within 45 days after the Grant <br /> Agreement End Date, except as otherwise authorized by written amendment of this Agreement and <br /> issued by the DEPARTMENT. <br /> Public Assistance Grant Agreement Page 4 of 21 City of Everett, D20-122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.