My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
>
Address Records
>
MCDOUGALL AVE
>
3302
>
SNO VALLEY PROCESS SOLUTIONS
>
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 11:54:46 AM
Creation date
2/24/2021 1:12:09 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3302
Tenant Name
SNO VALLEY PROCESS SOLUTIONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• S <br /> EVE RETT August 19, 2019 <br /> WASHINGTON Peter Newland <br /> peter@hillstreetinvestment.com <br /> PO Box 5459 <br /> Everett,WA 98206 <br /> Owner: Hill Street Investment, LLC <br /> Job Address: 3302 McDougall Ave <br /> Plan Check No: B1906-039 <br /> RE: Building Permit Review Letter <br /> Dear Mr. Newland, <br /> In response to the application for a building permit,the plans have been <br /> examined and you are advised that revisions may be necessary before a permit <br /> can be issued. Please review and respond to the comments below. <br /> • <br /> ARCHITECTURAL <br /> 1. It is unclear where the property lines and proposed fire separation distances <br /> are based on the proximity of the proposed structure to existing structures. <br /> Please indicate the property lines and proposed fire separation distances as it is <br /> unclear whether the proposed structure or existing structures (North and <br /> South)will need fire resistive construction. IBC 602. <br /> 2. On Sheet A3.1, item 15, a new self-supporting canopy may require fire- <br /> resistive construction given the potential proximity to property lines per IBC <br /> 602. Please revise canopy location or provide details indicating fire-resistive <br /> canopy construction. <br /> STRUCTURAL <br /> 1. From the Architectural Sheet A2.1,the mezzanine level is indicated as a <br /> storage use. Per ASCE 7-10 Sec 12.7.2, a minimum of 25%of the floor live load <br /> is to be included in the effective seismic weight take off for the structure. <br /> Please revised seismic base shear numbers as required. <br /> PERMIT SERVICES 2. The proposed concrete retaining wall is indicated to be approximately 9'-0" <br /> in retained soil height. Per Architectural Sheet A1.1,the area at the top of the <br /> 9 3200 Cedar Street retaining wall is designated as a loading area, but according to Detail 4/S3.1, it <br /> Everett,WA 98201 appears that no traffic surcharge, or other such loading fora permanent <br /> retaining wall appear to be included in its design. Please revise design as <br /> 425.257.8810 required. IBC 1604.1, 1604.2. <br /> 425.257.8857 fax <br /> everetteps@everettwa.gov 3. It appears that potential regrading of the site where the proposed loading <br /> - everettwa.gov/permits area is to be constructed may be imposing new soil loads on existing structures <br /> to the North and South of the loading area. Please provide calculations that <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.