Laserfiche WebLink
_.....,. <br /> 2: fp <br /> ( ,,,,,,, <br /> September 20th, 2019 <br /> To: James Bronder, PE, SE <br /> Associate Engineer/ Plans Examiner <br /> City of Everett <br /> Correction Letter <br /> RE: Project Permit Review#1 <br /> Owner: Hill Street Investment, LLC <br /> Job Address: 3302 McDougall Ave <br /> Plan Check No: B1906-039 <br /> Mr. Bronder, <br /> In response to our correspondence last week, the plans have been examined and revised per your <br /> comments in order to receive approval for a building permit. Please see the response to your <br /> comments below. <br /> Comments: <br /> We have opted to keep the existing grade from the Alley way onto the property. This will eliminate the <br /> need for the previously designed retaining wall and eliminate the issue of additional loading on the existing <br /> CMU wall of the building to the north and the neighboring retaining wall to the south. <br /> Sincerely, <br /> Matt Schreifels <br /> matts2812architecture.com <br /> 2812 Colby Ave Everett, WA 98201 ® C E VE <br /> -z)) <br /> SEP 2 3 2019 <br /> CITY OF EVERETT <br /> Permit Services <br /> 2812 Colby Avenue Everett WA 98201 <br /> P (425)252-2153 www.2812architecture.com <br />