2/2/2021 City of Everett Page 1 <br /> 11:31:54AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1906-039 Site Address 3302 MCDOUGALL AVE#BLDG B <br /> Applied 6/25/2019 Applicant NEWLAND PETER Lot <br /> Approved 9/27/2019 Owner HILL STREET INVESTMENT LLC Block <br /> Issued 9/27/2019 Contractor DUANE 0 CRAWFORD INC Tract <br /> Parent Permit No. Description CONSTRUCT 2340SF WAREHOUSE ADDITION <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 10/16/2019 10/16/2019 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 10/25/2019 10/25/2019 BLDG DWF PARTIAL APPR (10/25/2019 9:05 AM DWF) <br /> 03-FOUNDATION As noted: <br /> Contractor to complete hold down install <br /> and rebar placement as discussed,then ok <br /> for concrete. <br /> 10/29/2019 10/29/2019 BLDG KMK APPROVAL 425-399-0616 <br /> 03-FOUNDATION <br /> (10/28/2019 3:33 PM KMK) <br /> KMK changed Inspection Date/Time from <br /> 10/28/2019 to 10/29/2019 <br /> 11/8/2019 11/8/2019 BLDG DWF PARTIAL APPR Duane Crawford 425-259-8122 <br /> 02-FOOTING/SETB <br /> (11/8/2019 12:02 PM DWF) <br /> 3 thickened footing locations in slab. <br /> Ok for concrete. <br /> 1/7/2020 1/7/2020 BLDG KMK APPROVAL as noted (1/7/2020 3:35 PM KMK) <br /> 07-EXTERIOR Complete LTP4 installation. <br /> 1/9/2020 1/9/2020 BLDG KMK CORRECTION (1/9/2020 3:28 PM KMK) <br /> 08-FRAMING Refer Anchorage of roof system to existing <br /> CMU:provide special inspection reports <br /> (see S1.0"anchorage"#25-27). <br /> 1/9/2020 1/9/2020 BLDG 13-ROOF KMK APPROVAL as noted (1/9/2020 3:28 PM KMK) <br /> NAILING Provide special inspection reports per <br /> approved plans. <br /> 1/30/2020 1/30/2020 BLDG KMK PARTIAL APPR as noted (1/30/2020 3:13 PM KMK) <br /> 08-FRAMING 1.Complete fire blocking at 10'vertical on <br /> walls. <br /> 2.Ok to insulate <br /> Provide special inspection reports and final <br /> letters per plan at final <br /> 2/25/2020 2/25/2020 BLDG KMK APPROVAL as noted: (2/26/2020 7:49 AM KMK) <br /> 11-INSULATION Leave areas open to complete electrical <br /> rough-in inspection. <br /> (2/26/2020 8:28 AM KMK) <br /> Complete electrical inspections before <br /> cover <br /> 2/26/2020 2/26/2020 BLDG KMK APPROVAL east wall East wall <br /> 10-INTERIOR <br /> 3/3/2020 3/3/2020 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 3/4/2020 3/4/2020 BLDG DWF OTHER <br /> 09-DRYWALL <br /> 3/31/2020 3/31/2020 BLDG 15-FINAL KMK CORRECTION Complete PW+Elec (3/27/2020 7:01 AM TAH) <br /> finals DUANE CRAWFORD 425-343-8122 <br /> 4/1/2020 4/1/2020 BLDG 15-FINAL KMK APPROVAL Subject to Fire& AM Inspection requested <br /> Landscape final 425-343-8122 <br /> 5/13/2020 5/13/2020 FIRE 02-FINAL BJP APPRVD-PERN DUANE CRAWFORD 425-343-8122 <br /> 5/15/2020 6/9/2020 CERTIFICATE OF TKJ APPROVAL <br /> OCCUPANCY <br /> INSP12 aili'SVST MS <br />