My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
>
Address Records
>
MCDOUGALL AVE
>
3302
>
SNO VALLEY PROCESS SOLUTIONS
>
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 11:54:46 AM
Creation date
2/24/2021 1:12:09 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3302
Tenant Name
SNO VALLEY PROCESS SOLUTIONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/2/2021 City of Everett Page 1 <br /> 11:31:54AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1906-039 Site Address 3302 MCDOUGALL AVE#BLDG B <br /> Applied 6/25/2019 Applicant NEWLAND PETER Lot <br /> Approved 9/27/2019 Owner HILL STREET INVESTMENT LLC Block <br /> Issued 9/27/2019 Contractor DUANE 0 CRAWFORD INC Tract <br /> Parent Permit No. Description CONSTRUCT 2340SF WAREHOUSE ADDITION <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 10/16/2019 10/16/2019 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 10/25/2019 10/25/2019 BLDG DWF PARTIAL APPR (10/25/2019 9:05 AM DWF) <br /> 03-FOUNDATION As noted: <br /> Contractor to complete hold down install <br /> and rebar placement as discussed,then ok <br /> for concrete. <br /> 10/29/2019 10/29/2019 BLDG KMK APPROVAL 425-399-0616 <br /> 03-FOUNDATION <br /> (10/28/2019 3:33 PM KMK) <br /> KMK changed Inspection Date/Time from <br /> 10/28/2019 to 10/29/2019 <br /> 11/8/2019 11/8/2019 BLDG DWF PARTIAL APPR Duane Crawford 425-259-8122 <br /> 02-FOOTING/SETB <br /> (11/8/2019 12:02 PM DWF) <br /> 3 thickened footing locations in slab. <br /> Ok for concrete. <br /> 1/7/2020 1/7/2020 BLDG KMK APPROVAL as noted (1/7/2020 3:35 PM KMK) <br /> 07-EXTERIOR Complete LTP4 installation. <br /> 1/9/2020 1/9/2020 BLDG KMK CORRECTION (1/9/2020 3:28 PM KMK) <br /> 08-FRAMING Refer Anchorage of roof system to existing <br /> CMU:provide special inspection reports <br /> (see S1.0"anchorage"#25-27). <br /> 1/9/2020 1/9/2020 BLDG 13-ROOF KMK APPROVAL as noted (1/9/2020 3:28 PM KMK) <br /> NAILING Provide special inspection reports per <br /> approved plans. <br /> 1/30/2020 1/30/2020 BLDG KMK PARTIAL APPR as noted (1/30/2020 3:13 PM KMK) <br /> 08-FRAMING 1.Complete fire blocking at 10'vertical on <br /> walls. <br /> 2.Ok to insulate <br /> Provide special inspection reports and final <br /> letters per plan at final <br /> 2/25/2020 2/25/2020 BLDG KMK APPROVAL as noted: (2/26/2020 7:49 AM KMK) <br /> 11-INSULATION Leave areas open to complete electrical <br /> rough-in inspection. <br /> (2/26/2020 8:28 AM KMK) <br /> Complete electrical inspections before <br /> cover <br /> 2/26/2020 2/26/2020 BLDG KMK APPROVAL east wall East wall <br /> 10-INTERIOR <br /> 3/3/2020 3/3/2020 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 3/4/2020 3/4/2020 BLDG DWF OTHER <br /> 09-DRYWALL <br /> 3/31/2020 3/31/2020 BLDG 15-FINAL KMK CORRECTION Complete PW+Elec (3/27/2020 7:01 AM TAH) <br /> finals DUANE CRAWFORD 425-343-8122 <br /> 4/1/2020 4/1/2020 BLDG 15-FINAL KMK APPROVAL Subject to Fire& AM Inspection requested <br /> Landscape final 425-343-8122 <br /> 5/13/2020 5/13/2020 FIRE 02-FINAL BJP APPRVD-PERN DUANE CRAWFORD 425-343-8122 <br /> 5/15/2020 6/9/2020 CERTIFICATE OF TKJ APPROVAL <br /> OCCUPANCY <br /> INSP12 aili'SVST MS <br />
The URL can be used to link to this page
Your browser does not support the video tag.