My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
>
Address Records
>
MCDOUGALL AVE
>
3302
>
SNO VALLEY PROCESS SOLUTIONS
>
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 11:54:46 AM
Creation date
2/24/2021 1:12:09 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3302
Tenant Name
SNO VALLEY PROCESS SOLUTIONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Proposed Site Information: <br /> 1. How will your project change the existing conditions? <br /> THIS PROJECT WILL CONVERT APPROXIMATELY 2,340 SF OF ASPHALT TO ROOF/BLDG AND <br /> WILL REPLACE APPROXIMATELY 1,440 SF OF ASPHALT PAVEMENT WITH ASPHALT OR <br /> CONCRETE. <br /> 2. Please provide the following quantities of proposed hard surfaces in square feet: <br /> Proposed Roof Area: 2,340 SF <br /> Proposed Other Hard Surfaces(pavement,gravel,etc.): 1,440 SF(ASPHALT AND CONC. <br /> PAVEMENT) <br /> 3. How will you manage rooftop runoff after the project is completed? <br /> COLLECT WITH DOWNSPOUTS AND CONVEY TO EXISTING CBs ON-SITE. <br /> 4. How will you manage stormwater runoff from hard surfaces(driveways, paved pathways, <br /> patios,etc.)?Evaluate each type of hard surface separately. <br /> ALLOW TO DRAIN TO EX. CBs AS IN THE CURRENT CONDITION. <br /> Plan for Permanent On-Site Stormwater Management: <br /> You are required to "infiltrate, retain, and disperse stormwater" on your site to the maximum extent <br /> you can without causing erosion or flooding.The goal is to get stormwater runoff in contact with <br /> vegetated surfaces as much as possible before discharging to downstream conveyance systems. <br /> See Volume III, Chapter 12 of the 2010 Stormwater Management Manual for stormwater facility <br /> requirements: https://everettwa.gov/DocumentCenter/Home/View/1214 <br /> 1. Determine which options you must use for managing stormwater from rooftops via downspout <br /> disconnect by considering the following Best Management Practices(BMPs) in order: <br /> • BMP 12.30 On-site Infiltration Areas <br /> • BMP 12.40 Raingardens <br /> • BMP 12.50 Downspout Dispersion <br /> Notes: <br /> a. If location criteria can be met, but sizing criteria cannot,you must implement the BMPs to <br /> the maximum extent you can without causing erosion or flooding. Pre-sized facilities have <br /> been designed to meet 100%mitigation. Facilities may be able to be installed to achieve <br /> some stormwater mitigation. <br /> b. Other innovative downspout control BMPs such as rain barrels,ornamental ponds, <br /> downspout cisterns, dry wells,or other downspout water storage devices may also be used <br /> with prior approval by the City of Everett.These are options to consider after the above <br /> listed BMPs are evaluated. <br /> 2. Determine which options you must use for managing stormwater from hard surfaces (driveways, <br /> paved pathways,etc.) by considering the following for each type of hard surface proposed: <br /> • BMP 12.60 Concentrated Flow Dispersion <br /> • BMP 12.70 Sheet Flow Dispersion <br /> Note: Propose an alternative stormwater management plan if none of the above BMPs can feasibly be <br /> installed. (Examples:Shallow vegetated swale,perforated pipe stub-out, etc.) <br /> Provide your Evaluation below and Show where these will take place on a site map: <br /> a e3of7 <br /> CITY OF EVERETT 13200 Cedar Street I Everett, WA 98201 1425-257-8810 l everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.