Laserfiche WebLink
INSPECTION REPORT <br /> Date/011✓N Permit: . 19 d®"6(D7 <br /> - 6 CCU_ (� <br /> Contractor: <br /> Owner: <br /> Site Address: 3 D_aAz boa _ l gi 6 <br /> TYPE OF INSPECTION REQ ESTED ' <br /> EL CAL BUILDING MECHANICAL PLUMBING <br /> T ervlc ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> G work ❑Footing ❑Rough In ❑Rough In <br /> Slab/Con ' ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> g In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTH .- !NSULTATION: <br /> ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK Ft-T.C.O. ❑ CORRECTION REQUESTED C El FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 <br /> FOR REINSPECTION—24 hour notice required <br /> 0 r (dt,'PZ—le._ <br /> Inspector: ��/�0 Date: <br /> EIR 10/06 <br /> ( ) DATABAR,INC. <br />