My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
>
Address Records
>
MCDOUGALL AVE
>
3302
>
SNO VALLEY PROCESS SOLUTIONS
>
3302 MCDOUGALL AVE SNO VALLEY PROCESS SOLUTIONS 2021-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 11:54:46 AM
Creation date
2/24/2021 1:12:09 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3302
Tenant Name
SNO VALLEY PROCESS SOLUTIONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1i <br /> 20. After completing all required Land Use processes, please submit 4 sets of civil plans with your public <br /> works permit application package along with 2 sets of drainage reports,SWPPP's and any additional <br /> reports.Please let me know if you have any questions while putting your plans together. <br /> 21. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> Snohomish County Public Utility District No.1:Jason Zyskowski,425.783.4318 <br /> The District presently has sufficient electric system capacity to serve the proposed development. <br /> However,the existing District facilities in the local area may require upgrading.The developer is <br /> required to supply the District with suitable locations/easements on all parcels where electrical facilities <br /> must be installed to serve the proposed development. It is unlikely that easements will be granted on <br /> District-owned property,or consents granted within District transmission line corridors. Existing PUD <br /> facilities may need relocations or modifications at the developer's expense.Any relocation,alteration or <br /> removal of District facilities to accommodate this project shall be at the expense of the project <br /> developer,and must be coordinated with the PUD in advance of final design. Please include any utility <br /> work in all applicable permits. <br /> Cost of any work,new or upgrade,to existing facilities that is required to connect this proposed <br /> development to the District electric system shall be in accordance with the applicable District policy.The <br /> developer will be required to supply the District with suitable locations/easements upon its property for <br /> any electrical facilities that must be installed to serve the proposed development. <br /> Please contact the District prior to design of the proposed project. For information about specific <br /> electric service requirements,please call the District's Everett office at 425-783-8272 to contact a <br /> Customer Engineer. <br /> • <br /> Pa e6o <br /> Project Nos. REVII19-016,REVI19-017 <br /> EVERETT <br />
The URL can be used to link to this page
Your browser does not support the video tag.