Laserfiche WebLink
I <br /> Component Performance Path, pg. 2 ENV-UA <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2, R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> Project Title: Panattoni,Glacier,Compass TI Date date <br /> Fenestration Area as%gross above-grade wall area 11.8% Max.Target: 30.0% For Building Department Use <br /> Skylight Area as%gross roof area Max.Target: 3.0% <br /> Building Component Proposed UA Target UA <br /> Ins. R Plan/Detail# F-factor Source&Table#8 F-factor x Perimeter =UA(U x A) F-factor x Perimeter= UA(U x A) <br /> l R= No insulation 0.730 402 293.5 0.540 402 217.1 <br /> 0 <br /> m s R= Slab-On-Grade F-0.54 <br /> m <br /> 3 R <br /> ° -0 R= 0.550 <br /> 0 <br /> m co R= Heated Slab-On-Grade F-0.55 <br /> = R= <br /> Schedule ID U-factor Source9'10 U-factor x Area(A) =UA(U x A' U-factor x Area(A)= UA(U x A) <br /> m 3'x 7'wood mandoors-(5)non insulated 0.061 105 6.4 0.37 105 38.9 <br /> a Opaque Swing Doors U-0.37 <br /> 3 <br /> 0 <br /> 0 <br /> O 0.34 <br /> Opaque rollup&sliding U-0.34 <br /> O <br /> @ 0.30 <br /> a) Non-Metal Frame U-0.30 <br /> C <br /> 0 <br /> z <br /> NFRC rated assembly 0.38 556 211.3 0.38 556 211.3 <br /> c L= Metal Frame,Fixed U-0.38 <br /> o = <br /> ° a <br /> a 2 <br /> a) <br /> act ri 0.40 <br /> u_ o <br /> m Metal Frame,Operable U-0.40 <br /> 0 CO <br /> N 4) <br /> a)o <br /> NFRC rated assembly 0.60 42 25.2 0.60 42 25.2 <br /> c <br /> E Metal Entrance Door U-0.60 <br /> C <br /> a <br /> o 0 0.50 <br /> s nT All types U-0.50 <br /> 00 i_ <br /> —_ <br /> cn <br /> Area' UA Area' UA <br /> Page 2 Subtotal 1105 536 1105 492 <br /> Page 1 Subtotal 10220 356 10220 496 <br /> TO COMPLY-The Proposed Total UA shall not <br /> exceed the Target Total UA. Project Total 11325 892 11325 989 <br /> Component Performance Compliance (UA) UA COMPLIES <br /> Note 1-If vertical fenestration or skylight area exceeds maximum allowed per C402.4.1, then Target Area Adjustment of all applicable envelope <br /> elements will be calculated automatically by the compliance form. Refer to Target Area Adjustments worksheet for this calculation. <br /> Note 2-Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 3-Proposed CMU mass wall in non-Group R that meet Table C402.1.4 Footnote D requirements can enter the target U-value of 0.014 <br /> Note 4-For semi-heated spaces utilizing the wall insulation exception, enter Target Wall U-factors under Proposed Wall U-factors so exterior <br /> walls are neutral to the calculation. <br /> Note 5-Mass transfer slab edges must be covered with an assembly having an overal U-factor of 0.2. <br /> Note 6-Demising walls,doors,and vertical fenestration separating spaces with different degrees of space conditioning(unconditioned,semi-heated, <br /> fully conditioned)shall be included only on the ENV-UA form for the space with the greatest degree of space conditioning. <br /> Note 7-List Group R above grade mass walls here. List all other mass walls, Commercial and Group R,in the Opaque Walls-Above Grade section. <br /> Note 8 -Slab-on-grade F-Factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 9 -Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1.A door is defined as 1. <br /> opaque if less than 50%of the door area has glazing. <br /> Note 10-Fenestration assembly U-Factors shall be the manufacturer's NFRC product rating, which includes the glazing and frame,or shall b� ` <br /> the default value per Section C303.1.3. <br />