My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5402 S 1ST AVE 2022-05-23
>
Address Records
>
S 1ST AVE
>
5402
>
5402 S 1ST AVE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:18:00 PM
Creation date
2/25/2021 11:44:21 AM
Metadata
Fields
Template:
Address Document
Street Name
S 1ST AVE
Street Number
5402
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. EXISTING CONDITIONS SUMMARY <br /> The project site consists of one existing lot (Tax Parcel Number: 00500302700100). The <br /> lot is approximately 0.16 acres. The existing site consists of mostly brush with a couple <br /> deciduous trees. The project site is bordered by Zillah St to the north, S. 1st Ave to the <br /> east and an alley to the west. Access to the site will be from the alley to the west, which <br /> will be improved/paved under the permit application for Lot 2 adjacent to this project to the <br /> south. <br /> Vegetation on the site consists of brush a few deciduous trees. The existing site does not <br /> contain any impervious surfaces. However, the off-site alley and roadway along the <br /> project frontage consists of gravel and is required to be paved for this project. <br /> Approximately 7,218 sf(0.166 acres) of the site and adjacent RIW will be impacted by new <br /> or replaced impervious surfaces, including off-site improvements. The entire site will be <br /> disturbed as needed for the clearing/grubbing and restoration of the existing site. <br /> The proposed area of disturbance drains to the east toward the eastern property line. <br /> Some upstream runoff from the west drains toward the project site. See the upstream <br /> analysis in Section 3 of this report. All the new and replaced impervious surfaces on this <br /> lot will be infiltrated on-site with the runoff from the improvements in the RNV being <br /> collected and conveyed to the downstream system. <br /> As previously mentioned, a geotechnical investigation was done for this project site and <br /> the general soil conditions for the site were found to be glacial till. The general soil <br /> conditions for this project site based on USDA Web-Soil Survey were found to be <br /> Alderwood-Urban land complex type soils,:: The general site slopes for the project area are._._.... <br /> moderate and average approximately 10 percent down to the east. Based on the existing <br /> soil information and the setbacks of the proposed improvements from any of the property <br /> lines or critical areas there is little potential for erosion or sedimentation during <br /> construction, assuming the basic BMPs included in the SWPPP are installed and <br /> maintained properly. Refer to Figure 2 for an existing basin map. <br /> • <br /> • <br /> • <br /> Zillah Lot 1 SFR 18-0605 <br /> Aug.2019 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.