Laserfiche WebLink
• <br /> No. 2—Infiltration <br /> Maintenance Defect Conditions When Maintenance Is Results Expected When <br /> Component Needed Maintenance Is <br /> Performed <br /> General Trash &Debris See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> (No. 1). <br /> Poisonous/Noxious See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> Vegetation (No. 1). <br /> Contaminants and See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> Pollution (No. 1). <br /> Rodent Holes See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> (No. 1) <br /> Storage Area Sediment Water ponding in infiltration pond after Sediment is removed <br /> rainfall ceases and appropriate time and/or facility is cleaned <br /> allowed for infiltration. Treatment basins so that infiltration system <br /> should infiltrate Water Quality Design Storm works according to <br /> Volume within 48 hours, and empty within design. <br /> 24 hours after cessation of most rain <br /> events. <br /> (A percolation test pit or test of facility <br /> indicates facility is only working at 90%of <br /> its designed capabilities.Test every 2 to 5 <br /> years. If two inches or more sediment is <br /> present, remove). <br /> Filter Bags(if Filled with Sediment and debris fill bag more than 1/2 Filter bag is replaced or <br /> applicable) Sediment and full. system is redesigned. <br /> Debris <br /> Rock Filters Sediment and By visual inspection, little or no water flows Gravel in rock filter is <br /> Debris through filter during heavy rain storms. replaced. <br /> Side Slopes of Erosion See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> Pond (No. 1). <br /> Emergency Tree Growth See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> Overflow Spillway (No. 1). <br /> and Berms over 4 <br /> feet in height. <br /> Piping See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> (No. 1). <br /> Emergency Rock Missing See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> Overflow Spillway (No. 1). <br /> Erosion See"Detention Ponds"(No. 1). See"Detention Ponds" <br /> (No. 1). <br /> Pre-settling Facility or sump 6"or designed sediment trap depth of Sediment is removed. <br /> Ponds and Vaults filled with Sediment sediment. <br /> and/or debris <br /> Volume V—Runoff Treatment BMPs—December 2014 <br /> 4-35 <br />