My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5402 S 1ST AVE 2022-05-23
>
Address Records
>
S 1ST AVE
>
5402
>
5402 S 1ST AVE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:18:00 PM
Creation date
2/25/2021 11:44:21 AM
Metadata
Fields
Template:
Address Document
Street Name
S 1ST AVE
Street Number
5402
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No.22(continued)-Maintenance Standards and Procedures for Permeable Pavement. <br /> Recommended Frequency. <br /> Component Condition when Maintenance is Needed Action Needed <br /> P Routine (Standards) (Procedures) <br /> Inspection Maintenance <br /> Inlets/Outlets/Pipes(cont'd) .. <br /> Overflow B Native soil is exposed or other signs of erosion damage are Repair erosion and stabilize surface <br /> present at discharge point <br /> :Aggregate Storage;Reservoir- <br /> Observation port A.S Water remains in the storage aggregate longer than If immediate cause of extended ponding Is not identified,schedule investigation of subsurface materials or other potential <br /> anticipated by design after the end of a storm causes of system failure. <br /> Vegetation ',. ,, <br /> Adjacent large shrubs As needed Vegetation related fallout clogs or will potentially clog voids •Sweep leaf litter and sediment to prevent surface clogging and pending <br /> or trees •Prevent large root systems from damaging subsurface structural components <br /> Once in May and Vegetation growing beyond facility edge onto sidewalks, Edging and trimming of planted areas to control groundcovers and shrubs from overreaching the sidewalks,paths and street <br /> Once in September paths,and street edge edge improves appearance and reduces clogging of permeable pavements by leaf litter,mulch and soil. <br /> Leaves,needles,and In fall(October to Accumulation of organic debris and leaf litter Use leaf blower or vacuum to blow or remove leaves,evergreen needles,and debris(i.e.,flowers,blossoms)off of and away <br /> organic debris December)after leaf from permeable pavement <br /> drop(1-3 times, <br /> depending on <br /> canopy cover) <br /> • Frequency:A=Annually;B=Biannually(twice per year);S=Perform inspections after major storm events(24-hour storm event with a 10-year or greater recurrence interval). <br /> e Inspection should occur during storm event. <br /> Volume V—Runoff Treatment BMPs—December 2014 <br /> 4-63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.