My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5406 S 1ST AVE 2021-02-25
>
Address Records
>
S 1ST AVE
>
5406
>
5406 S 1ST AVE 2021-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 12:40:16 PM
Creation date
2/25/2021 12:38:51 PM
Metadata
Fields
Template:
Address Document
Street Name
S 1ST AVE
Street Number
5406
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> REG 07-,1-2018(T UE) 07:57 <br /> T n o REG-1 019550 <br /> IETT <br /> PERMITPERMITi�(�.1807005 CT 1 <br /> 1 P/C $1,202.86 <br /> 1807014 <br /> (425)257-88A0 $462.64 <br /> 1807015 <br /> 1 P/C $462.64 <br /> Plan ;heck No.: 2 9c3lEteott4 <br /> CARD $2,128.14 <br /> Application Date: 7/31/2018 <br /> Tenant: [TenName] <br /> Owner: ELM HOMES LLC <br /> Job Address: 5406 S 1ST AVE <br /> Proposed Use: <br /> Description of Work: NEW SFR DETACHED <br /> Plan Check Fee Paid: $462.64 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> z41_ <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.