My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5406 S 1ST AVE 2021-02-25
>
Address Records
>
S 1ST AVE
>
5406
>
5406 S 1ST AVE 2021-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 12:40:16 PM
Creation date
2/25/2021 12:38:51 PM
Metadata
Fields
Template:
Address Document
Street Name
S 1ST AVE
Street Number
5406
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/26/2021 Cityof Everett Page 1 . <br /> 1:20:53PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1807-015 Site Address 5406 S 1ST AVE <br /> Applied 7/31/2018 Applicant ALLEN RONALD C Lot <br /> Approved 1/7/2020 Owner VANTAGE POINT HOMES LLC Block <br /> Issued 1/8/2020 Contractor ELM HOMES LLC Tract <br /> Parent Permit No. PW1908-046 Description NEW SFR DETACHED <br /> Notes **LANDSCAPE FINAL NEEDED BEFORE FINAL**CONTACT KELSEY HEYD 425-257-7275** <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 1/23/2020 1/23/2020 BLDG DWF APPROVAL Bret:425-220-6291 <br /> 02-FOOTING/SETB <br /> (1/23/2020 12:20 PM DWF) <br /> Contractor install UFER ground and <br /> verified PL set backs. <br /> 2/20/2020 2/20/2020 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 3/5/2020 3/5/2020 BLDG KMK APPROVAL (3/5/2020 10:52 AM KMK) <br /> 05-UNDERFLOOR KMK changed Inspection Type from BLDG <br /> 08-FRAMING to BLDG <br /> 05-UNDERFLOOR FRAMING <br /> 3/6/2020 3/6/2020 PLUMB SDP PARTIAL APPR water service (3/6/2020 1:25 PM SDP) <br /> 02-GROUND Install blue,not less than 18 AWG,wire <br /> adjacent to the piping.Ok to backfill <br /> leaving the ditch open on both ends and <br /> recall for inspection after the meter is <br /> installed. <br /> 3/10/2020 3/10/2020 PLUMB MPI OTHER roof top drain system kurt 425-508-3878 am if possible <br /> 03-ROUGH IN <br /> (3/10/2020 8:18 AM SDP) <br /> turned this inspection over to the public <br /> works inspection team see pw1908-046 <br /> 4/2/2020 4/2/2020 BLDG KMK CORRECTION see notes Scott 425-348-1155 <br /> 07-EXTERIOR <br /> (4/2/2020 12:58 PM KMK) <br /> Add A-34's or equivalent per shear wall <br /> schedule at floor to floor connections. <br /> Can send photos:kkeck@everettwa.gov <br /> 4/29/2020 4/29/2020 GAS 01-ROUGH IN DXW APPROVAL (4/29/2020 11:57 AM DXW) <br /> 19 psi. <br /> 4/29/2020 4/29/2020 MECH 04-ROUGH DXW NOT READY 425-348-1155 Scott Gower <br /> IN <br /> 4/29/2020 4/29/2020 PLUMB DXW CORRECTION (4/29/2020 11:55 AM DXW) <br /> 03-ROUGH IN hang water service properly in crawl. <br /> complete hot water tank relief line to <br /> outside. <br /> 5/4/2020 5/4/2020 MECH 04-ROUGH SDP APPROVAL As noted: Scott 425-348-1155 <br /> IN <br /> (5/4/2020 3:25 PM SDP) <br /> Consult with the building inspector <br /> concerning the insulation requirements in <br /> the floor/ceiling in the garage. <br /> 5/4/2020 5/4/2020 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 5/5/2020 5/5/2020 BLDG KMK CORRECTION see notes (5/5/2020 1:31 PM KMK) <br /> 08-FRAMING 1.Add interior shear wall to bedroom 3.See <br /> plans. <br /> 2.Tie interior shear wall to truss per S1/8 <br /> detail <br /> 3.Add truss bracing to 5 trusses above <br /> master bedroom.See truss specs. <br /> Ok to insulate <br /> 5/7/2020 5/7/2020 BLDG KMK APPROVAL Scott 425-348-1155 <br /> 11-INSULATION <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.