Laserfiche WebLink
PUBLICVORKS PERMIT Date Applied: 8/23/2019 <br /> 112 City of Fverett Permit Services Publicrks Permit#: PW1908-046 <br /> EVERETT 3200 Cedar Street, 2"d Floor <br /> Everett, WA 98201 Associated #:Planning ReferenceBldgPermit#: C1807-015 <br /> WASHINGTON 425-257-8810 Public Works Fee: $2,338.27(� (� <br /> OWNE NAME AND ADDRESS: APPLICANT NAME AND ADDRESS:' 2, 4 D£C 2019 <br /> EL HOMES LLC ALLEN RONALD C <br /> ZILLAH ST <br /> EVERETT,WA,98203 , , <br /> PHONE:4253590951 PHONE:4255084380 <br /> TAX PARCEL ID#:00500302700200 SITE ADDRESS:5406 S 1ST AVE <br /> DESCRIPTION:SITE WORK FOR NEW SFR-LOT 2 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 12/10/2019.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at https://pw.everettwa.gov to <br /> formally request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection <br /> online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards,approved SWPPP/Plan,and per the direction of the PW <br /> Inspector. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. r -4 <br /> 7-8 <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced mpervious surraces v l be°rihanaged <br /> on-site in a manner that does not adversely affect neighboring properties,including the Cit }"- ' n�- eas ents and the <br /> � ---- <br /> improvements located therein. , ,2-, <br /> 10.Completion of all frontage improvements is required prior to receiving permit final,TCO,or Certificate of r3•Zet?°pan( , <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Sched the, >ii: ting <br /> Planning Landscape inspection under"My Active Inspections"in your dashboard on the Onlineffkrm.tting Portal. . <br /> $, dfPA 1 D Sgrin�IPr�are cpnl,i Bd I^Crn �r�+c Cnrinklar P +rron • .As --nii' <br /> 13.This permit must be finaled in order to close out this permit/grant a Certificate of Occupan Request a final inspection onle by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests for this priii Olen all items have been conleted. <br /> •gAE . 1 <br /> Public Works Permit Fee Breakdown: 5' a ' <br /> r�s�+, •a ,earn,F) <br /> �•3 r— c� a cy rr <br /> Erosion Control $50.00 _;, ,-,-, <br /> Grade/Fill/Excavate(700CY) $170.00 •--" C--Y <br /> i 7 C„N <br /> Paving(4,423SF) $45.00 I— <br /> PW Plan Review $192.03 <br /> PW Site Inspection $384.06 <br /> Stormwater System Development Fee(6,019SF) $1,497.18 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> /I The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> jf j 414TAM i� /Z/Z!f Zo,g causes of action that may arise because of installation and maintenance of <br /> Approved for Construction/(Public Works) Date r the improvement or other right-of-way use here to applied for and further <br /> agrees to emove same upon notice from the City and to replace public <br /> pro erty maged ther by. <br /> FINAL INSPECTION Date <br /> ' � 7 <br /> Approved as Constructed(PW Inspector) Signature of pplic Dat <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> iie <br />