My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5406 S 1ST AVE 2021-02-25
>
Address Records
>
S 1ST AVE
>
5406
>
5406 S 1ST AVE 2021-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 12:40:16 PM
Creation date
2/25/2021 12:38:51 PM
Metadata
Fields
Template:
Address Document
Street Name
S 1ST AVE
Street Number
5406
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10: Control DeWatering <br /> DeWatering may be necessary for this project. However, the existing vegetation retained <br /> on site would be available to spread any water from construction for filtration and disposal <br /> (BMP C236). <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change (BMP C150). BMPs should be inspected and maintained as needed <br /> after every rain event producing more than %" of rain in a 24-hour period. Also, BMPs <br /> shall be inspected on a weekly basis even if site work is not occurring. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. Whenever inspection and/or monitoring <br /> reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br /> actual discharge of or potential to discharge a significant amount of any pollutant, <br /> appropriate BMPs or design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the <br /> short plat. The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or could have, a <br /> significant effect on the discharge of pollutants to waters of the state. The SWPPP shall <br /> be modified if, during inspections or investigations conducted by the owner/operator, or <br /> • the applicable local or state regulatory authority, it is determined that the SWPPP is <br /> ineffective in eliminating or significantly minimizing pollutants in stormwater discharges <br /> from the site. The SWPPP shall be modified as necessary to include additional or <br /> modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be <br /> completed within seven days following inspection. (BMP C150 & C162) <br /> • •13:.Protect-On-Site..Stormwater Management BMPs for Runoff from Hard Surfaces <br /> The use of infiltration BMPs for this project will allow for the installation of these features at <br /> the end of the project during final stabilization. That will protect those areas from <br /> disturbance or compaction. In addition, the organic content of the amended soils will be <br /> tested and verified prior to final project acceptance. (BMP C103) <br /> Zillah Lot 2 SFR 18-0605 <br /> Aug."2019 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.