Laserfiche WebLink
Stormwater Infiltration Letter NGA Project No. 1040718 <br /> Zillah Street Residential Development Infiltration June 20,2018 <br /> Everett,Washington Page 6 <br /> with contract plans and specifications. We should be contacted a minimum of one week prior to <br /> construction activities and could attend pre-construction meetings if requested. <br /> Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br /> with generally accepted-geotechnical engineering practices in effect in this area at the time this letter was <br /> prepared. No other warranty, expressed or implied, is made. Our observations,findings,and opinions are <br /> a means to identify and reduce the inherent risks to the owner. <br /> o-o-o <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />