My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8319 5TH AVE W 2021-02-26
>
Address Records
>
5TH AVE W
>
8319
>
8319 5TH AVE W 2021-02-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 7:06:08 AM
Creation date
2/26/2021 7:05:44 AM
Metadata
Fields
Template:
Address Document
Street Name
5TH AVE W
Street Number
8319
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/2/2020 page 1 <br /> � City of Everett / <br /> 1:0W.„16PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1905-134 Site Address 8319 5TH AVE W <br /> Applied 5/21/2019 Applicant KULAGA AHMET&SEVALA Lot <br /> Approved 5/21/2019 Owner KULAGA AHMET&SEVALA Block <br /> Issued 5/21/2019 Contractor TUGHAN ELECTRIC INC Tract <br /> Parent Permit No. C1701-017 Description NEW TOWNHOME WIRE TO CODE <br /> Notes SPRINKLERS REQUIRED.Planning approval required priot to final.Contact the Planning Dept @ <br /> 425-257-8731 <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 5/22/2019 5/22/2019 ELEC 06-ROUGH SKB APPROVAL eTRAKiT Inspection 5/21/2019 2:49 PM TUGHAN ELECTRIC <br /> IN Request INC <br /> Open site. Questions,call Edis at <br /> 206-830-0126. <br /> Contact Name:TUGHAN ELECTRIC INC <br /> Site Address:8319 5TH AVE W <br /> Phone:4258688072 <br /> e-Mail:Larry@tughanelectric.com <br /> 6/25/2019 6/25/2019 ELEC 05-SERVICE SKB CORRECTION 206-830-0126 Edis Kulaga <br /> Requested call prior to inspection for access <br /> (6/25/2019 2:13 PM SKB) <br /> Install a main breaker so there are no more <br /> than six disconnecting means for the <br /> service.Install a proper grounding electrode <br /> connection at the encased electrode <br /> conductor.Use the proper size PVC and <br /> expansion joints for the number of wires <br /> and size of wires.Install properly size <br /> service entrance conductors for 400 amp <br /> buss. <br /> 9/25/2019 9/25/2019 ELEC 05-SERVICE SKB CORRECTION eTRAKiT Inspection 9/24/2019 8:39 AM TUGHAN ELECTRIC <br /> Request INC <br /> For access,please call Edis Kulaga 1 hour <br /> before arrival: 206-830-0126 <br /> Contact Name:TUGHAN ELECTRIC INC <br /> Site Address:8319 5TH AVE W <br /> Phone:4258688072 <br /> e-Mail:Larry@tughanelectric.com <br /> (9/25/2019 2:29 PM SKB) <br /> Bond the Myers hub fitting in the service. <br /> Properly size the service entrance <br /> conductors.Mark the main service <br /> disconnect as such and remove the service <br /> disconnect label from sub feed breakers. <br /> 9/30/2019 9/30/2019 *NO INSPECTION PTEC OTHER Cancel by Contractor 9/27/2019 1:47 PM TUGHAN ELECTRIC <br /> CURRENTLY INC <br /> For access,please call Edis 1 hour prior to <br /> arrival at:206-830-0126. <br /> Contact Name:TUGHAN ELECTRIC INC <br /> Site Address:8319 5TH AVE W <br /> Phone:4258688072 <br /> e-Mail:Larry@tughanelectric.com <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.