Laserfiche WebLink
12/3/2020 age 4 <br /> City of Everett <br /> 9:22:06AM. <br /> INSPECTION ACTIVITY REPORT <br /> 5/21/2020 5/21/2020 FIRE 02-FINAL MAW CORRECTION eTRAKiT Inspection 5/15/2020 8:34 AM GAFFNEY <br /> Request CONSTRUCTION <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address:8615 7TH AVE SE <br /> Phone:4257373126 <br /> e-Mail: <br /> JOE.nardinger@GAFFNEYCONSTRUCTI <br /> ON.COM <br /> (5/20/2020 11:10 AM MAW) <br /> To complete: <br /> Foor Plan(laminated 11"x17")It shall <br /> indicate the location of all initiating <br /> devices,inspector's test valve,monitored <br /> valves and main corridors,stairwells and <br /> elevators. <br /> NFPA 72 Report <br /> Pretest Printout <br /> 24 Hour Battery Test <br /> Maximum Load test on Secodary Power <br /> 6/3/2020 6/3/2020 FIRE 02-FINAL MAW PARTIAL APPR eTRAKiT Inspection 6/2/2020 12:58 PM GAFFNEY <br /> Request CONSTRUCTION <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address:8615 7TH AVE SE <br /> Phone:4257373126 <br /> e-Mail: <br /> JOE.nardinger@GAFFNEYCONSTRUCTI <br /> ON.COM <br /> (6/3/2020 11:53 AM MAW) <br /> All life safety systems are in place wth the <br /> exception of ermegency lighting. Campus <br /> manager will develop temporary plan for <br /> using flashlights and ushers while the <br /> assembly space is occupied for church <br /> services. <br /> 6/9/2020 6/9/2020 BLDG 15-FINAL KMK PARTIAL APPR TCO as noted: 6/8/2020 2:12 PM GAFFNEY <br /> CONSTRUCTION <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address:8615 7TH AVE SE <br /> Phone:4257373126 <br /> e-Mail: <br /> JOE.nardinger@GAFFNEYCONSTRUCTI <br /> ON.COM <br /> (6/9/2020 1:05 PM KMK) <br /> 1.Complete emergency egress lighting and <br /> recall for final building and fire inspection <br /> within 30 days.Maximun occupancy 49. <br /> 2.Complete Public Works final. <br /> 3.Complete Planning final. <br /> 4.Maintain safetly perimeters on site where <br /> work is being completed. <br /> INSP12 CMS)`STEM <br />