My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8615 7TH AVE SE 2021-02-26
>
Address Records
>
7TH AVE SE
>
8615
>
8615 7TH AVE SE 2021-02-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 10:31:46 AM
Creation date
2/26/2021 10:28:27 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8615
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Summary, pg 1 PROJ-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> General Info Project Title: ST.MARY MAGDALEN CHURCH Date 2/12/2019 <br /> PROD-SUM form Project Street Address: 8517 7th Ave.SE For Building Department Use <br /> shall be provided as Project City,County,Zip: Everett,Snohomish,98208 <br /> a cover sheet for all <br /> compliance form Project Owner or Rep: Richmond Engineering <br /> submittals.Project <br /> Title shall match Jurisdiction: City of Everett <br /> project plans title <br /> block. <br /> Project Description New Construction and Additions <br /> Select all that apply to the ❑New Building 0 Building Addition <br /> scope of project. <br /> Select Addition+Existing Existing Building Retrofit <br /> or Alteration+Existing if <br /> the existing building will be ❑Alteration ❑Change of Occupancy ❑Change in Space Conditioning <br /> combined with the addition <br /> or alteration to demonstrate <br /> compliance per Section ❑ Historic Building <br /> C502.1 or C503.1. <br /> Building Elements Scope-Select all that apply <br /> ❑All Q Building Envelope ❑Mechanical Systems <br /> ❑Service Hot Water Systems ❑ Lighting Systems ❑Electrical Systems <br /> Q All Commercial 0 Group R-R2,R3,&R4 0 Mixed Use <br /> over 3 stories and all R1 <br /> Occupancy Type Mixed Use-Building is greater than three stories above grade and it has both Commercial and Group <br /> P Y yP R occupancies. <br /> Mixed Occupancy-Building is three stories or less above grade and it has both Commercial and <br /> Group R2,R3 or R4 occupancies.Select All Commercial to document compliance for the commercial <br /> areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. <br /> Select all that apply to the scope of project <br /> Q Fully Conditioned ❑ Semi-heated2 ❑Refrigerated Spaces <br /> (Warehouse and/or Walk-int) <br /> ❑Low Energy Space Category3 <br /> Space Conditioning <br /> Categories Eligible Low Energy Spaces <br /> ❑Unconditioned ❑ Low energy heating/cooling capacity <br /> ❑Wireless service ❑ Greenhouses ❑Equipment building <br /> equipment shelter <br /> Floor Area and Floors Above Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area <br /> Grade <br /> Stories 1 14,069 14,069 <br /> Q Compliance Method 1 -General C Compliance Method 2-Total Building Performance <br /> Compliance Method 1-Projects shall demonstrate compliance with all applicable mandatory and <br /> prescriptive requirements of this code. Refer to C401.2,Item 1 for more information.Compliance forms to <br /> General Compliance include with a Prescriptive submittal:All applicable ENV,LTG,and MECH. <br /> Path Compliance Method 2-Projects complying via total building performance(TBP)shall include a summary of <br /> results from a whole building energy model per Section C407 and shall demonstrate compliance with all <br /> applicable mandatory provisions in this Code.Refer to Section C401.2,Item 2 for more information. <br /> Compliance forms to include with a TBP submittal:PROJ-SUM,ENV-CHK,LTG-EXT,LTG-CHK,and all <br /> MECH forms except MECH-ECONO and MECH-VENT(pending). <br /> Note 1-Refrigerated Spaces-They shall comply with the envelope and refrigeration equipment requirements in Section C410.Warehouse <br /> coolers and freezers shall also comply with the envelope requirements in C402. C410 takes precedent for overlapping requirements. <br /> Note 2-Semi-heated Spaces-If heated with equipment other than electric resistance may take an exemption for wall insulation.All other <br /> envelope assemblies shall comply with the thermal envelope provisions. <br /> Note 3-Exemptions For Low Energy Spaces-Low Energy spaces are exempt from all provisions in WSEC Section C402 Building Envelope, <br /> however all other applicable provisions in the Code do apply including lighting,mechanical,service water heating,etc. <br /> Note 4-Eligible Space Conditioning For Low Energy Greenhouses-Greenhouses are defined as spaces that maintain a specialized sunlit <br /> environment that is used exclusively for cultivation,protection and maintenance of plants.Cooling with outside air and/or evaporative <br /> cooling,and any form of heating equipment,are allowed under the Low Energy Greenhouse category. Greenhouses with cooling <br /> equipment that requires a condensing unit are NOT eligible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.