Laserfiche WebLink
• <br />• <br />PRIVATE WORK <br />Amount <br />Item Unit FQuantity Unit Price�F <br />Storm Sewers <br />4 - 6 Inch Pipe <br />L.F. <br />190 <br />20.00 <br />3800 <br />8 Inch Pipe <br />L.F. <br />25.00 <br />12 Inch Pipe <br />L.F. <br />315 <br />35.00 <br />11025 <br />Yard Basin <br />Ea. <br />2 <br />200.00 <br />400 <br />Standard Catch Basin <br />Ea. <br />4 <br />700.00 <br />2100 <br />Extra Depth Excavation, <br />Over 12' dee <br />Ft./L.F. <br />5.00 <br />48 Inch MH/CB Type II <br />Ea. <br />1 <br />1,800.00 <br />1800 <br />54 Inch MH/CB Type II <br />Ea. <br />4 <br />2,700.00 <br />10,800 <br />Extra Depth MH/CB, <br />48 inch per ft. over 12 <br />Ft. <br />110.00 <br />Extra Depth MH/CB, <br />54 inch per ft. over 12 <br />Ft. <br />140.00 <br />Restrictor/Pollution Control, <br />12 Inch Large) <br />Ea. <br />1 <br />1,000.00 <br />1000 <br />Storm Water Vault <br />Ea. <br />1 <br />55,000 <br />60,000 <br />Other — Sand Filter Vault <br />Ea. <br />1 <br />20,000 <br />20,000 <br />Storm Sewers Total: $ 110,925 <br />f <br />COST EST FEE CALC - 2017 <br />