Laserfiche WebLink
Western 0 <br />Engineers <br />iliqiw:�o <br />' ' Inc. <br />SURVEYORS • PLANNERS • ENGINEERS <br />March 1, 2018 <br />City of Everett Public Works <br />Attn: Sabrina Fandler <br />3200 Cedar Street <br />Everett, WA 98201 <br />425-257-8800 <br />Comm kss p& s& Cam, <br />9740 Evergreen Way * Everett, Washington 98204 <br />(425) 356-2700 <br />RE: Permit # PW 1703-022, Silver Plaza Retail and Office <br />Dear Mrs. Fandler: <br />FAX (425) 356-2708 <br />Below you will find responses to comments made in your letter dated January 24, 2018. <br />Revisions and Conditions: <br />1. Acknowledged. <br />a. Resubmittal Items <br />V. Transmittal Sheet included with resubmittal package. <br />,/ii. Acknowledged. 4 copies of revised plans included with resubmittal package. �c <br />1 ii. Acknowledged. 2 copies of revised reports included with resubmittal package. Fib -I <br />,/iv. Acknowledged. 2 copies of separate O&M report plans included with resubmittal <br />ss package. <br />Jv. Acknowledged. 2 copies of revised SWPPP report included with resubmittal RE <br />package. <br />vi. Easement form still being worked on. Please review the updated easement <br />depiction and let us know if it is sufficient for finalizing easement document. <br />;wii. P.W. Cost Estimate form included with resubmittal packagi.�? <br />,/viii. CD with pdf's of resubmittal package is included. <br />b. Acknowledged. <br />c. Acknowledged. <br />d. Acknowledged. Also note wall mount FDC moved to street side per fire comments. <br />i. Acknowledged. <br />2. Acknowledged. <br />a. Drainage Report: <br />i. Project Overview: <br />1. Acknowledged, 2014 version now specified. <br />2. This information is already shown on the Aerial and Downstream Map after <br />the Downstream Analysis narrative. <br />3. Added a Basin Map following the upstream/downstream narrative section <br />showing the upstream and on -site drainage basins. Also added longest <br />length of conveyance to Executive Summary section. All other information <br />is adequately described within the set of plans included alongside this <br />report. Existing/construction flow paths can be seen on the Grading and <br />LAND USE CONSULTANTS * CIVIL ENGINEERS * LAND SURVEYORS * ENGINEERING CORPORATION <br />RAIDSERVER\2015\15-1415-A SILVER PLAZA\ENGINEERING\PUBLIC WORKS REVIEW RESPONSE LETTER <br />