Laserfiche WebLink
• <br />0 <br />Sabrina Fandler <br />From: Erik Emerson <br />Sent: Wednesday, March 28, 2018 4:56 PM <br />To: Sabrina Fandler <br />Subject: Silver Plaza - Review Comments for March 2018 Resubmittal <br />Follow Up Flag: Follow up <br />Flag Status: Flagged <br />Sabrina, <br />Robin and I have finished reviewing the latest submittal for the Silver Plaza project and have the following <br />comments:- <br />Drainage Report �Z) C <br />t�P(E S w �1��%n✓ � /eL� 7�� V'�K /. S,Wft � SAiAr DkI <br />1. Update the table of contents. <br />2. Permanent Stormwater Control Plan <br />o This section was added in the updated Drainage Report, but all of the information required per Volume <br />I, Section 3.1.5 of the Stormwater Management Manual (SWMM) is not provided. <br />o See Volume I, Section 3.1.5 of the SWMM for complete documentation requirements. <br />R_ Fxhihits <br />o Vicinity map — Missing: the route of stormwater to Silver Lake (provided instead on separate aerial map, <br />which is not a required exhibit) and discussion or illustration of significant geographic features and <br />sensitive/critical areas. <br />o Site map - Missing: drainage from the site; routes of existing, construction, and future flows at all <br />discharge points; length of travel from the farthest upstream end of the proposed conveyance to the <br />proposed flow control and water quality treatment BMPs. <br />o See Volume I, Section 3.1.7 of the SWMM for the complete listing of documentation requirements. <br />4. French Drain sizing calculations: <br />o Manning n of 0.011 used for PVC pipe, but the value for PVC in DCSS Table 4.2.2(3) is 0.013. <br />o PVC pipe sizing calculations were provided, but calculations and design details need to be provided for <br />other components of the French Drain. <br />5. Minimum Requirement (MR) #6 — Runoff Treatment <br />o See comments below for Sheet 6. <br />6. MR #7 — Flow Control <br />o Delineate and map the extent of the flow control bypass area and call out the acreage on one of the <br />maps provided. <br />o The minimum orifice size provided of 0.45 inches is lower than the allowed minimum orifice size of <br />0.5-inch. This smaller orifice size may be allowed if the live storage were reduced to 3 feet in <br />accordance with Volume III, Section 3.2.4 (Control Structures) of the SWMM. <br />o WWHM modeling to size the flow control facility must properly account for dead storage. <br />7. MR #8 — Wetland Protection <br />o If true, modify text to state that the project site does not discharge to wetlands upstream of the <br />Silver Lake receiving water. The 300-foot threshold described in the Drainage Report does not apply <br />to this minimum requirement. <br />8. MR #9 —Operation and Maintenance <br />o Updates were made in the Drainage Report to satisfy the City's comments in their January 2018 <br />letter, but those updates were not included in the stand-alone O&M Manual. Update the stand- <br />alone 0&M Manual accordingly. <br />CXJ2 <br />