My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10521 19TH AVE SE 2022-05-23
>
Address Records
>
19TH AVE SE
>
10521
>
10521 19TH AVE SE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:22:25 PM
Creation date
2/26/2021 2:35:12 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10521
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Silver Lake Plaza <br />Minimum Requirement # 2: SWPPP Narrative <br />Element #1: Mark Clearing Limits <br />Clearing limits have been shown on the SWPPP Plan. <br />Element #2: Establish Construction Entrance <br />A temporary construction entrance at the southwest corner of the site connecting to 19th <br />Avenue SE has been shown on the SWPPP plan. All vehicles shall be free of debris prior to <br />leaving the site. <br />Element # 3: Control Flow Rates <br />Flow rates during construction are to be contained through the installation of a temporary <br />silt fencing on the south and west sides of the site. <br />Element # 4: Install Sediment Controls <br />Sediment controls mainly consist of installation of a temporary silt fencing on the south <br />and west sides of the site. <br />Element # 5: Stabilize Soils <br />All soils disturbed during site grading will be stabilized by use of the most appropriate <br />BMP method available. These consist of short-term and long-term solutions. Short-term <br />methods consist of compaction of the soils by vibratory roller or bulldozer. Long-term <br />methods consist of straw covering over the soils (this is in the case of the project becoming <br />dormant for greater than 1 month). At this time no wintertime grading or construction <br />activities will occur. During construction periods longer than 1 working week (7 days) <br />where the soils are exposed and un-worked will use the proscribed methods in the Storm <br />Water Management Manual for Western Washington to reduce sedimentation transported <br />offsite. If winter grading is conducted, all exposed soils shall be covered within 2 days. <br />Element # 6: Protect Slopes <br />No steep slopes exist on -site; steep slope protection is not required. <br />Element # 7: Protect Drain Inlets <br />All catch basins within 500 feet downstream of the site will be protected with catch basin <br />sediment inserts. <br />Element # 8: Stabilize Channels and Outlets <br />Channels and drainage outlets are not needed around the proposed development area on <br />site. No stabilization is necessary. Existing channels or drainage outlets located within 500- <br />feet of the property of the property should be routinely inspected for debris that may dam <br />and/or aid erosion. <br />Element # 9: Control Pollutants <br />All pollutants from construction vehicles will be contained and disposed of in the approved <br />manner consistent with state environmental policies. Any vehicle maintenance will be <br />performed by authorized mechanics using drip pans and waste containment vessels. All <br />pollutants will be disposed offsite at approved facilities. <br />WESTERN ENGINEERS, INC. 12 PROJECT: 15-1415-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.