My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LBA/PFF Industrial Associated/West Valley LLC 11/18/2020
>
Contracts
>
Real Property
>
Easements
>
LBA/PFF Industrial Associated/West Valley LLC 11/18/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 11:03:10 AM
Creation date
3/1/2021 11:02:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
LBA/PFF Industrial Associated/West Valley LLC
Approval Date
11/18/2020
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Consent to Easement Amazon Warehouse S Everet
Tracking Number
0002796
Total Compensation
$0.00
Contract Type
Real Property
Contract Subtype
Easements
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
202011191344 Document:AC MT Rec: S207,00 Page-8 of 11 <br /> Record Date:11/19/2020 3:44 PM Snohomish County,WA <br /> Exhibit A <br /> Legal Description of the Existing City Easement <br /> AN EASEMENT OVER. UNDER AND ACROSS A PORTION OF LOT 2, OF MOUNTAIN VIEW <br /> BUSINESS CENTRE BINDING SITE PLAN DIVISION NUMBER 6, AS RECORDED UNDER <br /> RECORDINO NUMBER 20061102M04. RECORDS OF SNOHOMISH COUNTY, WASIgNGTON AND <br /> LOCATED IN THE SOUTHWEST(WARM Of SECTION 1.TOWNSHIP 2 NORM.RANGE 04 EAST. <br /> WM. <br /> SAID EASEMENT BEING 15 00 FOOT WIDE. HAVING 7 50 FEET ON EACH SIDE OF THE <br /> FOLLOWING DESCRIBED CENTERLINE <br /> COMMENCING AT THE NORTHEAST CORNER OF LOT I Of SAID BINDING SITE PLAN, SAID <br /> POINT BEING ON THE SOUTH MARGIN OF SHUMAN WAY. <br /> THENCE NORTH 1194152.06"EAST ALONG SAID SOUTH MARGIN 220 BO FEET TO THE EASTERLY <br /> MARGIN OP ASSOCIATED BOULEVARD AlD SNIPES AN WAY AS SHOWN ON SAID BINDING Sr;E <br /> PLAN, <br /> THENCE NORTH 0000754" WEST ALONG SAW EASTERLY MARGIN 60 00 FEET TO THE SOUTH <br /> LINE OF A PROPOSED TRACT, <br /> THENCE NORTH 89°52'06"EAST PARALLEL TO THE EASTERLY EXTENSION OF TILE sointERLy <br /> MARGIN OF SAID SHUICSAN WAY AND ALONG THE SOUTH LINE OF SAID PROPOSSD TRACT <br /> 454 91 MT TO THE SOUTHEAST CORNER OF SAID PROPOSED'TRACT, <br /> THENCE RETURNING SOUTH 891°521)6" EAST ALONG SAID SOUTH LINE 10/ 75 FEET TO THE <br /> POINT OF BEGINNING OF SAID EASEMENT CENTERLINE DESCRIVIION, <br /> THENCE NORTH 00°121r EAST 183 41 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT <br /> "A", <br /> THENCE C* r 0 NORTH 00°12129-EAST 360 91 FEET TO A POINT HEREINAFTER REFERRED <br /> TO AS POINT"8". <br /> THENCE CONTINUING NORTH 00°1219"EAST 293 37 FEET TO A POINT HEREINAFTER REFERRED <br /> TO AS POINT-C". <br /> THENCE CONTINUING NORTH 00°inr EAST 323 74.1=-1 TO A POINT HEREINAFTER REFERRED <br /> TO AS POLIO „aair <br /> THENCE COWTINIANO NORTH 00°12'29"EAST 265 62 FEET. <br /> THENCENORTH 89°4737"WEST 129 49 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT <br /> THENCE CONTINUING NORTH 89°4711" WEST 26$01 FEET TO THE EAST MARGIN OF SAID <br /> ASSOCIATED BOULEVARD AND THE TERMINUS OF SAID EASEMENT CENTERLINE <br /> DESCRIPTION. <br /> A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.