My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5810 FLEMING ST 2021-03-01
>
Address Records
>
FLEMING ST
>
5810
>
5810 FLEMING ST 2021-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 11:51:21 AM
Creation date
3/1/2021 11:51:03 AM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
5810
Notes
Flat to Meter Conversions Spaces 8, 20, 21, 23, 24 and 51
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br /> 1/8/2021 15:58 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 2/8/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 13 11 <br /> Title CONVERT.75 INCH 5810 FLEMING ST#8 UT3473-13-11 <br /> Work Order No 20200737 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 2/8/2020 Time 08:48 Original WO Billing <br /> Customer Information <br /> Customer Name Customer Id <br /> Address Street <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( ) - Ext <br /> Second Phone ( ) - Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 581018 Street FLEMING ST <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem WATER WATER <br /> Sub Problem OTHER OTHER <br /> Requested By Date Requested <br /> Agency Related Request <br /> Initiated From <br /> Utility Locate(USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept Priority Estimated Hours <br /> Crew <br /> Contractor <br /> Assigned To <br /> Assigned By <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments INVENTORY MATERIAL IN THE AMOUNT OF$509.20 JOURNALIZED IN <br /> 2020 <br /> Action Taken CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND BOX.FLAT TO METER <br /> PROJECT. <br /> Recommended Action <br /> Approved By JDF JERRETT,DANIEL F. Job Cost Information(Y/N) <br /> Start Date / / Time Date Completed 3/12/2020 Permit No <br />
The URL can be used to link to this page
Your browser does not support the video tag.