Laserfiche WebLink
r <br /> Work Activity Work Order Page 2 <br /> 1/7/2021 13:44 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 9/30/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 20 3 <br /> Title CONVERT.75 INCH 8600 10TH AVE SE UT3473-20-3 <br /> Work Order No 20201826 Project Activity Type . CORRECTIVE MAINTENANCE Status CL <br /> Status 9/30/2020 Time 15:13 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Comp! Date Comments <br /> WS1885C049 WASRVC YES 11/6/2020 <br /> Address 8600 10TH AVE SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 10TH AVE SE-8600 <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 77.161 11/06/2020 PAP <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.785 11/06/2020 PAP <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 2 8.482 11/06/2020 PAP <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.431 11/06/2020 PAP <br /> M VALV34008348 VALVE METER 3/4 LOCKWING ANGLE METER VALVE SWVLNUT X 3/4FIP 2 134.898 11/06/2020 PAP <br /> Total Material Cost ($233.76-) <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS .25 6.405 11/06/2020 <br /> NA N/A CLAMP 1 1.85 11/06/2020 <br /> NA N/A TR WIRE 3 .6 11/06/2020 <br /> NA N/A TOPSOIL .12 3.554 11/06/2020 <br /> Total NA Cost $12.41 <br /> Total Cost $246.17 <br />