Laserfiche WebLink
IAssociated Earth Sciences,Inc. Exploration Log <br /> Project Number Exploration Number Sheet <br /> f trPf4 KE080697A EB-3 1 of 1 <br /> I Project Name Everett Hotel <br /> Everett. WA Ground Surface Elevation(ft) —130' <br /> Location Datum NAVI N3R <br /> Driller/Equipment Environmental Drilling Date Start/Finish in g/1- 1/1 g/N <br /> Hammer Weight/Drop 140#/30" Hole Diameter(in) 8" <br /> I <br /> tl' N - O O N is, ( <br /> s T 91 to Blows/Foot 1- <br /> I co 00 <br /> � o <br /> T DESCRIPTION "0 as m 10 20 30 40 0 <br /> 1Asphalt concrete pavement. r <br /> - Weathered Vashon Lodgement Till <br /> IMoist,reddish brown,silty SAND,few gravel(SM). 5 <br /> S-1 PID: I 4 A6 <br /> I 2 <br /> — 5 With gravel. 2 <br /> - I S-2 PID: 1 • 4 A9 <br /> 1 Becomes grayish tan. 5 <br /> Vashon Lodgement Till <br /> I S-3 Very moist,grayish tan,mottled,silty SAND,with gravel(SM). 7 <br /> PID:1 19 A69 <br /> 50 <br /> i — 10 = S-4 50/1" <br /> No recovery. A501'" <br /> (Blow count likely overstated due to gravel content;rock stuck in auger bit) <br /> _ I S-5 No mottling. 15 <br /> PID:0 50 £65 <br /> — 15 <br /> 13-6 Contains lenses of moderately clean,fine sand. 26 <br /> PID:1, 50 �7s <br /> Bottom of exploration boring at 18.5 feet <br /> — 20 No unusual odors or staining observed. Ground water not encountered. <br /> I - <br /> I — 25 <br /> I <br /> - 30 <br /> I • <br /> — 35 <br /> 0 <br /> 0 <br /> t (N <br /> 2- <br /> I 0 <br /> m <br /> Sampler Type(ST): <br /> o 2"OD Split Spoon Sampler(SPT) 0 No Recovery M-Moisture Logged by: TJP <br /> m I <br /> 3"OD Split Spoon Sampler(D&M) E Ring Sample SZ Water Level() Approved by: fjp <br /> a Grab Sample Q Shelby Tube Sample— Water Level at time of drilling(ATD) <br />