My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 7/15/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
WA ST Dept of Ecology 7/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 10:56:39 AM
Creation date
3/10/2021 10:55:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
7/15/2020
Council Approval Date
7/15/2020
End Date
6/30/2021
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Landfill Development Oversight Grant
Public Works WO Number
TCPRA-1921-EverPW-00080
Tracking Number
0002815
Total Compensation
$290,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington Department of Ecology Page 11 of 27 <br /> Agreement No: TCPRA-1921-EverPW-00080 <br /> Project Title: Everett Landfill Tire Fire <br /> Recipient Name: CITY OF EVERETT <br /> E <br /> SCOPE OF WORK <br /> i <br /> Task Number: 4 Task Cost: $120,000.00 <br /> Task Title: FEASIBILITY STUDYAND REMEDY SELECTION-J004 <br /> i <br /> 1 <br /> Task Description: i <br /> This task funds RECIPIENT eligible costs ECOLOGY deems reasonable and necessary to complete Sampling and Analysis -` <br /> Plan(SAP)Revisions,feasibility studies,consistent with Consent Decree No.01 2 03640 6 for the site. L <br /> F <br /> Eligible activities include SAP revisions,project management costs,a review of existing well and gas probe locations and the 1 <br /> installation of new monitoring wells and landfill gas probes at other locations as needed. This includes any surveying,mapping, <br /> brush clearing and site preparation activities or vactor services needed to replace the wells or initiate the advancement of the <br /> boreholes to replace the damaged probes. Eligible costs may also include waste profiling, and proper disposal of any waste <br /> derived during activities performed under this task either onsite per the Consent Decree or at an offsite permitted landfill. <br /> Task Goal Statement: <br /> a <br /> Provide environmental monitoring of the Everett Landfill in compliance with Consent Decree 01-2-03640-6,and to install new <br /> 1. <br /> or to replace damaged monitoring wells and landfill gas probes at the site. <br /> t <br /> Task Expected Outcome: <br /> Ecology approved Sampling and Analysis Plan that is field implemented and ongoing in compliance with Consent Decree 01 2 <br /> 03 640 6. z <br /> Recipient Task Coordinator: Randy Loveless,Hanna Lintukorpi <br /> FEASIBILITY STUDY AND REMEDY SELECTION-J004 <br /> Deliverables <br /> Number Description Due Date <br /> 4.1 Feasibility Study <br /> 4.2 Draft Cleanup Action Plan(DCAP) <br /> Template Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.