My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 7/15/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
WA ST Dept of Ecology 7/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 10:56:39 AM
Creation date
3/10/2021 10:55:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
7/15/2020
Council Approval Date
7/15/2020
End Date
6/30/2021
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Landfill Development Oversight Grant
Public Works WO Number
TCPRA-1921-EverPW-00080
Tracking Number
0002815
Total Compensation
$290,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington Department of Ecology Page 14 of 27 <br /> Agreement No: TCPRA-1921-EverPW-00080 <br /> Project Title: Everett Landfill Tire Fire <br /> Recipient Name: CITY OF EVERETT <br /> SCOPE OF WORK <br /> Task Number: 6 Task Cost: $325,000.00 <br /> Task Title: CLEANUP CONSTRUCTION-J006 <br /> Task Description: <br /> This task funds RECIPIENT's eligible costs ECOLOGY deems reasonable and necessary to complete the physical <br /> construction of each cleanup action component required under the cleanup agreement for the Site,(CD No. 01 2 03640 6), <br /> including any compliance monitoring during physical construction. Eligible costs may include: <br /> •Permit applications for constructing a cleanup action component. <br /> •Physical construction of a cleanup action component,such as removing and disposing of contaminated material or installing a <br /> treatment system,engineered control,or monitoring network. <br /> For example,for monitored natural attenuation or recovery,eligible costs may include installing an initial network of monitoring <br /> wells to evaluate the progress of attenuation or recovery. <br /> •Physical construction of a stormwater source reduction and treatment facility required as part of the cleanup action,such as <br /> an absorption unit or stormwater pond. <br /> •Protection monitoring to confirm that human health and the environment are adequately protected during physical construction <br /> of a cleanup action component as specified in the health and safety plan.This includes any sampling and analysis or other <br /> testing. <br /> •Performance monitoring during physical construction to determine whether a cleanup action component has attained or is <br /> attaining cleanup standards and,if appropriate,remediation levels or other performance standards.This includes any sampling <br /> and analysis or other testing. <br /> •Establishment of an institutional control,including developing and filing an environmental covenant or alternative mechanism. <br /> •Construction oversight,documentation,surveying and mapping,and quality assurance and control. <br /> •Project management and coordination with ECOLOGY during construction. <br /> Task Goal Statement: <br /> To complete the cleanup actions in accordance with the cleanup action plan,the engineering design specifications,construction <br /> plans,and standard safety and engineering practices. <br /> Task Expected Outcome: <br /> The completed cleanup will be protective of human health and the environment and meet Model Toxics Control Act cleanup <br /> levels. <br /> Recipient Task Coordinator: Randy Loveless,Hanna Lintukorpi <br /> CLEANUP CONSTRUCTION-J006 <br /> Deliverables <br /> Number Description Due Date <br /> 6.1 Construction Completion Report <br /> Template Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.