My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 7/15/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
WA ST Dept of Ecology 7/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 10:56:39 AM
Creation date
3/10/2021 10:55:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
7/15/2020
Council Approval Date
7/15/2020
End Date
6/30/2021
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Landfill Development Oversight Grant
Public Works WO Number
TCPRA-1921-EverPW-00080
Tracking Number
0002815
Total Compensation
$290,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington Department of Ecology Page 2 of 27 <br /> Agreement No: TCPRA-192I-EverPW-00080 <br /> Project Title: Everett Landfill lire Fire <br /> Recipient Name: CITY OF EVERETT <br /> ECOLOGY and the RECIPIENT have been working together since 1994 to clean up the Everett Landfill Tire Fire Site. >Y <br /> The Site has now met the cleanup standards under the Model Toxics Control Act(MTCA). " <br /> From about 1917 to 1974,parts of the Site were used for landfill purposes.At first,the Site was used as a burning <br /> dump,a scrap metal recycling and burial yard,and a municipal landfill.The southern portion of the Site was the last <br /> active fill area.November 1974 was the last month that waste was received.The next year,the whole landfill was <br /> graded and closed in compliance with the regulations in effect at the time(WAC 173-301). A 12-inch soil layer was <br /> placed over the waste and was seeded with grass.In 1977,a commercial recycling operation began storing old rubber <br /> tires on the central and eastern half of the Site.After this,there were two fires in the tire piles,one in 1983 and one in 1 <br /> 1984. <br /> Contaminants of concern at this Site are total petroleum hydrocarbons(TPH),polycyclic aromatic hydrocarbons 1 <br /> (PAH),bis(2-ethylhexyl)phthalate,and metals. Additional concerns were for control of landfill gas in the then current <br /> structures on and around the Site. <br /> The RECIPIENT completed two Interim Actions at the Site under MTCA,but before a Consent Decree was signed. <br /> The first Interim Action was the Everett Landfill Site Grading in 1995. This project improved the site grading and the <br /> control of surface water. The RECIPIENT graded the entire Site(except for the two tire fire areas)to collect and <br /> control surface water and to reduce leachate. The RECIPIENT then put an extra two feet of soil cover over the waste <br /> areas,and improved site drainage. <br /> r <br /> The second Interim Action was in 1997 and 1998. During this project,the RECIPIENT: <br /> • Installed a geomembrane cover on the eastern side slopes of the landfill. <br /> • Added a lined leachate collection trench and transmission system for treatment at Everett's Waste Water Treatment <br /> Plant. <br /> • Added two leachate pump stations. <br /> • Installed a leachate control force main and access road. <br /> • Installed site fencing. <br /> • Added site cover. <br /> • Controlled storm water on the eastern portion of the site. <br /> • Removed and disposed of sediments in ditches around the site. <br /> • Removed and disposed of the tires and tire fire ash that remained. <br /> In 2001 the RECIPIENT signed a Consent Decree,No.01 2 03640 6,with ECOLOGY for a Remedial <br /> Investigation/Feasibility Study and Cleanup Action Plan. The Consent Decree allowed for redevelopment of the Site. <br /> The RECIPIENT did further landfill gas monitoring from 2001 to 2003 and installed a perimeter landfill gas control <br /> system in 2004,and improved it in 2006 and again in 2012. <br /> The Snohomish County's onsite Everett Transfer Station was closed and torn down in 2004.In 2006 the RECIPIENT <br /> built a bridge to pass 41st street over the existing rail lines west of the Site.It also includes landfill gas control for the <br /> part of 41st street on the landfill. <br /> In 2007 and 2008 the RECIPIENT's animal shelter was also relocated off site and the building was demolished,leaving <br /> no structures on site. <br /> The Consent Decree for the Everett Landfill was prepared to allow site redevelopment,which is being completed by a <br /> private developer. The timing of the grant and work scope is critical to the redevelopment of the Site, The Site was first <br /> purchased by a developer in 2008;a second developer purchased the Site in 2013,with current redevelopment steps <br /> Template Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.