My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 12/12/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Snohomish County 12/12/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:24:42 PM
Creation date
3/10/2021 12:23:20 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
12/12/2019
Council Approval Date
10/16/2019
End Date
12/31/2021
Department
Parks
Department Project Manager
Bob Hillman
Subject / Project Title
Lowell Riverfront Trail Off Leash Dog Area
Tracking Number
0002819
Total Compensation
$80,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 1. ROW 38.7OA,070(3)"A capital facilities plan element consisting of:(a)An inventory <br /> 3 of existing capital facilities owned by public entitles,showing the locations and <br /> 4 capacltles of the capital facilities;(b)a forecast of the future needs for such capital <br /> 5 des;(c)the proposed locations and capacities of expanded or new capital <br /> S fad l es;(d)at least a six-year plan that will finance such capital facilities within <br /> 7 . prole led funding capacities and clearly identifies sources of public money for such <br /> 3 purposes;and(e)a requirement to reassess the land use element if probehlo <br /> 9 funding fails shot of meeting existing needs and to ensure that the land use <br /> 10 element,capital facilities plan element,and financing plan within the capital facilities <br /> 11 plan element are c oa rdlnated and consistent.Park and recreation facilities shall be <br /> 12 included in the capital facilities plan element.'Tile 2019-2024 CiP Includes a stx- <br /> 13 year financing plan for all of the County's capital facilities.The 2019-2024 CIF'also <br /> t4 assesses the adequacy of funding and regulatory mechanism for those pudic <br /> 15 capital facilities necessary to support development to maintain their respective <br /> 16 minimum level of service(LOS), <br /> 17 <br /> 18 2. GMA planning Goal 12(ROW 36.70A.020(12)) 'Public facilities and services. <br /> 19 Ensure tftat those pubiirc facilities and services necessary to support development <br /> 20 shall be adequate to sets the development at the time the development Is available <br /> 21 for occupancy end use without decreasing current service levels below locally <br /> 22 established minimum standards'The 2019--2024 CIP specifies{proposed fending <br /> 23 sources for the planned capital facilities and contains a"statement of assessment" <br /> 24 ' which addresses the need for a reassessment of land use or other comprehensive <br /> 25 plan elements if there is a projected shortfall in revenue(between 2019 and 2024) <br /> 25 that causes the LOS for a facility classified as necessary to support development to <br /> 27 fall below the minimum level identified In the capital facilities plan.The statement of <br /> 28 assessment portion of the 2019-2024 CIP finis that there are no funding shortfalls <br /> 29 ar regulatory inadequate that would effect the ability to maintain the mininwm LOS <br /> 30 for those capital facilities necessary to support development <br /> 31 <br /> 32 Q. The 2019-2024 CIF was developed for consistency with Puget Sound Regional Council <br /> 33 Vision 2040 Mutticcunty Planning Policies(MPP)including:MPP-PS-2`Time and phase <br /> 34 service end facilities to guide growth end development in a manner that supports the <br /> 35 regional vision.'The County's CFP and the 2019-2024 CIP align with the regional vision to <br /> 35 direct growth into urban areas where adequate public Infrastructure and services era <br /> 37 available or can be provided In an efficient manner by establishing minimum LOS for those <br /> 3a public capital facilities necessary to support development and by ensuring that adequate <br /> 30 funding and regulatory mechanisms are in place to maintain those minimum LOS, <br /> 40 <br /> 41 E. The 2019-2024 CIP was developed for consistency with Snohomish County Countywide <br /> 42 Planning Policy(CPS')PS-13`Jurisdictions should adopt capital facilities plans,and <br /> 43 coordinate with other service providers,to provide the appropriate level of service to <br /> 44 support planned growth and development In Urban Growth Areas."The 2019-2024 CIP,a <br /> 45 component of the County's CPP,is developed through a coordinated and collaborate <br /> 45 process between the County and non-County service providers of public capital facilllies <br /> 47 such as schools,water end sewer Infrastructure and service,and electric power. <br /> 48 <br /> AMENDED ORDNANCE NO,ie-08. <br /> RE llNG TO THE GGI: H MAI,I.AGEMENT ACT, <br /> ACING THE 201V-2024 CAPITAL IMPROV5MENT <br /> PROGRAM AS PART OF THE SNOHOMiSH COUNTY <br /> CAPITAL FACILSTIES PLAN-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.