Laserfiche WebLink
CITY OF EVERETT <br />FINAL CONTRACT VOUCHER CERTIFICATION <br />CONTRACTOR: IMCO General Construction, Inc. ADDRESS: 2116 Buchanan Loop <br />CITY: Ferndale STATE: WA 98248 DATE: October 20, 2020 <br />PROJECT TITLE: WPCF FEN Chlorination Building Upgrade <br />WORK ORDER NO. UP 3614 <br />DATE WORK COMPLETE: August 26, 2020 FINAL AMOUNT: $8,031,300.59 (includes WSST) <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br />performed and material furnished to the City of Everett, that the same or any part thereof has not been paid, <br />and that I am authorized to sign for the claimant; that I have not rented or purchased any equipment or <br />materials from any employee of the City; I further certify that the attached final estimate is a true and correct <br />statement showing all the monies due me from the City of Everett under this contract; that I have carefully <br />examined said final estimate and understand the same and that I hereby release the City of Everett from any <br />and all claims of whatsoever nature which I may have, arising out of the performance of said contract, which <br />are not set forth in said estimate. <br />CO <br />1O General Construction, Inc. <br />x LJ>'rc"- - 0,4)1 i G--- <br />TITLE <br />Subscribed and swo to before <br />Xthis 3 day of ' l Z020 <br />AAA- 1IAu_.1. ..Notary Public G I `� <br />in and for the State of Washington, residing at rn cit7 1 <br />PUBLIC WORKS DEPARTMENT CERTIFICATION <br />I Certify the attached final APPROVED Date: <br />estimate to be based upon actual <br />measurements and to be true and correct. <br />X X <br />Construction Manager Public Works Director <br />Tom Fuchs Ryan Sass <br />INSTRUCTIONS <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all <br />subcontractor's agents and forwarded with the Final Contract Voucher Certification. <br />Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a <br />claim attached. <br />Revised 9/94 <br />