Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 2/24/2021 10:36 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 9/9/2020 <br /> Fund 401 Account 5 Program 710 Function 11s Activity 664 <br /> Program <br /> Title INSTALL SAMPLE STATION 2131 LAKE HEIGHTS DR 119664 <br /> Work Order No 20201699 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 9/9/2020 Time 07:47 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> INSTALL SAMPLE STATION IN PLANTER STRIP ON CITY EASMENT. <br /> TAP 8 INCH DUCTILE MAIN. THIS IS A NEW SAMPLE STATION NO <br /> TUMMS ID <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M SADD46018447 SERVICE SADDLE 8 W/1 CC TAP FOR 8 DI 8.63-9.80 1 28.517 09/09/2020 PAP <br /> M ADAP34145347 ADAPTER 3/4 MIP X 1 IPS INSTA-TITE 1 29.149 09/10/2020 PAP <br /> M CONC00061338 CONCRETE MIX 60 LB.BAG CEMENT,SAND AND ROCK MIX 1 4.742 09/10/2020 PAP <br /> M CORP36002247 CORP STOP 1 CCT X 1 COPPER FLARE X 1 IPS INSTA-TITE 1 67.273 09/10/2020 PAP <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 4.241 09/10/2020 PAP <br /> M PIPE36060747 PIPE 1 POLY IPS 200 PSI SIDR7 ASTM D2239 3 1.95 09/10/2020 PAP <br /> Total Material Cost $135.87 <br /> Total Cost $135.87 <br />