Laserfiche WebLink
r 9 <br /> Work Activity Work Order Page 2 <br /> 2/24/2021 14:47 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 8/6/2020 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 673 <br /> Program <br /> Title PLUG 6 INCH VALVE 524 SHARON CREST 710119673 <br /> Work Order No 20201477 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 8/6/2020 Time 15:14 Original WO Billing <br /> Problem Details <br /> REMOVE CAST IRON WATER MAIN FROM VALVE AND INSTALL 6 INCH <br /> PLUG INN VALVE. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WVL3095U76 WAVALV YES 7/31/2020 <br /> Address 524 SHARON CREST <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M PLUG38108447 PLUG 2 NPT BRASS W/RAISED SQUARE 1 7.548 07/31/2020 PM <br /> M PLUG44300947 PLUG 6 MECHANICAL SEWER CHERNE 1 12.905 07/31/2020 PM <br /> M PLUG44035347 PLUG 6 MJ W/2 TAP DI 1 62.129 07/31/2020 PM <br /> Total Material Cost $82.59 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS 3 76.86 07/31/2020 <br /> NA N/A 6 IN MJ BOLT KIT 1 18.76 07/31/2020 <br /> Total NA Cost $95.62 <br /> Total Cost $178.21 <br />