My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
525 SHARON CREST 2021-03-29
>
Address Records
>
SHARON CREST
>
525
>
525 SHARON CREST 2021-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 9:28:50 AM
Creation date
3/29/2021 9:28:46 AM
Metadata
Fields
Template:
Address Document
Street Name
SHARON CREST
Street Number
525
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 2 <br /> 2/24/2021 10:56 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 8/27/2020 <br /> Fund 401 Account 6 Program 710 Function 119 Activity 677 <br /> Program <br /> Title INSTALL FIRE HYDRANT 525 SHARON CREST 710119677 <br /> Work Order No 20201575 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 8/27/2020 Time 06:10 Original WO Billing <br /> Problem Details <br /> INSTALL NEW FIRE HYDRANT ON THE END OF OUR NEW 6 INCH <br /> DUCTILE WATER MAIN. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WFH3095N01 WAHYD YES 8/27/2020 <br /> Address 525 SHARON CREST <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 525 SHARON CREST <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M HYDR44092047 HYDRANT 4 FT BURY MJ 1 2119.199 08/27/2020 PAP <br /> M STOR00128847 STORZ PORT ADAPTER 5"STORZ X 4-1/2"FEMALE NST 1 142.15 08/27/2020 PM <br /> Total Material Cost $2,261.35 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS 2 51.24 08/27/2020 <br /> NA N/A 4 IN MJ KIT 1 14.69 08/27/2020 <br /> NA N/A TOPSOIL 1 29.62 08/27/2020 <br /> NA N/A WASHED ROCK .5 12.81 08/27/2020 <br /> Total NA Cost $108.36 <br /> Personnel Costs <br /> nnoliod awl As pe;eldwo0 <br /> oN;pined 0zoz/L /8 pe;eldWoo a;ea eq.]. / / e;ea Pe;S <br /> (NIA)uol;ewJo4ul ;so°qor 1113HO1IIN'HDI2ia3121d 1IN1 A9 penoaddV <br />
The URL can be used to link to this page
Your browser does not support the video tag.