Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 3/10/2021 15:38 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 12/10/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 21 3 <br /> Title CONVERT.75 INCH 8308 UPPER RIDGE RD UT3743-21-3 <br /> Work Order No 20202084 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 12/10/2020 Time 11:10 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS1284Y004 WASRVC YES 12/28/2020 <br /> Address 8308 UPPER RIDGE RD <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 8308 UPPER RIDGE RD <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 77.161 01/01/2021 PAP <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 2 23.57 01/01/2021 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 211.398 01/01/2021 PAP <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 125.136 01/01/2021 PAP <br /> Total Material Cost 6437.27) <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 6.405 01/01/2021 <br /> Total NA Cost $6.41 <br /> Personnel Costs <br />