Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2021
>
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:39 PM
Creation date
3/29/2021 12:19:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
3/8/2021
Council Approval Date
7/8/2020
End Date
3/25/2021
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0002383
Total Compensation
$24,433.07
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 8/11/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No.: Two <br /> Change Order Effective Date: Date of Mayor's Signature <br /> Contractor and City agree as follows,: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for the <br /> changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract price <br /> shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or <br /> his designee is authorized to direct Contractor to perform additional work. In calculating such <br /> threshold amounts, Washington State sales tax, if applicable to the Work, has been <br /> considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this Change <br /> Order, the work described in Exhibit A, and all work and actual or constructive changes that <br /> occurred or began prior to the date of this Change Order, including, but not limited to, claims <br /> for equitable adjustment of time and compensation, delay, impact, overhead, or <br /> inefficiencies. This provision does not apply to requests for equitable adjustment of time or <br /> price for which the Contractor timely and properly provided notice of a differing site condition, <br /> protest, dispute, claim or Contract Claim as required by the Contract Documents. If the <br /> Contract Documents establish a time period for notice of a differing site condition, protest, <br /> dispute, claim, or Contract Claim that ends after the date of this Change Order, but relates to <br /> work performed prior to the date of this Change Order, then this provision does not apply if <br /> the Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent <br /> explicitly provided herein. <br />