My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2021
>
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:39 PM
Creation date
3/29/2021 12:19:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
3/8/2021
Council Approval Date
7/8/2020
End Date
3/25/2021
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0002383
Total Compensation
$24,433.07
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 8/11/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
............ ............ ... . <br /> 2/19/2021 <br /> Change Order No. 2-Fire Administration Building -Tenant Improvements Exhibit A <br /> No. ..... Construction Change Directives Amount! Change Order _ <br /> 1 Add Condinsate drain line &future vent line in basement. $ 1,107103 'Co 20 <br /> 2 Replace alarm locks with DL 2800 CR LFIC.. $ :...12,676189 ::CO 21 R1 <br /> 3 Add 16 DL3013-626 Deadbolts for front display doors $ 6,401120 CO 22 R1 <br /> No. Kirtley-Cole Associates, LLC.Change Proposals Amount' <br /> 1 Unforseen condition-Add 7 Corian Window Sills due to altered:drywall returns.:. :: ::.;$ 2,761[29 [CO 17 <br /> Design Development- Demo 2 existing unit heaters, unit heater venting, dryer duct ,' <br /> 2 &gas piping not being reused. Existing equipment to be removed not shown on <br /> HVAC demo drawings. $ 748.07 1 CO 19 <br /> 3 .. Replace existing sidelite glass with new 1" low-etempered glass per building code .. <br /> requirements:: $ : 857:26 ,:CO 23 <br /> 4 Ceilinyaccess hatch required by City Building Inspector. , $ 368.86 ! CO 25 <br /> 5 Credit for 2 returned DL 2700s door locks $ ' 487153) I CO 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.