My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 106TH PL SE 2021-03-29
>
Address Records
>
106TH PL SE
>
304
>
304 106TH PL SE 2021-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 2:53:06 PM
Creation date
3/29/2021 2:53:04 PM
Metadata
Fields
Template:
Address Document
Street Name
106TH PL SE
Street Number
304
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br /> 3/10/2021 15:28 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 12/10/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 21 3 <br /> Title CONVERT.75 INCH 304 106TH PL SE UT3473-21-3 <br /> Work Order No 20202072 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 12/10/2020 Time 10:54 Original WO Billing <br /> Customer Information <br /> Customer Name Customer Id <br /> Address Street <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( ) - Ext <br /> Second Phone ( ) - Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 304 Street 106TH PL SE <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem WATER WATER <br /> Sub Problem OTHER OTHER <br /> Requested By Date Requested <br /> Agency Related Request <br /> Initiated From <br /> Utility Locate (USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept Priority Estimated Hours <br /> Crew <br /> Contractor <br /> Assigned To <br /> Assigned By <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments INVENTORY MATERIAL IN THE AMOUNT OF$456.87 JOURNALIZED IN <br /> 2021 <br /> Action Taken CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND BOX.FLAT TO METER <br /> PROJECT.MEASUREMENTS ARE ON GO-SYNC. <br /> Recommended Action <br /> Approved By JDF JERRETT,DANIEL F. Job Cost Information(Y/N) <br /> Start Date / / Time Date Completed 12/21/2020 Permit No <br />
The URL can be used to link to this page
Your browser does not support the video tag.