Laserfiche WebLink
19009 W Mall Drive <br /> • <br /> • <br /> • <br /> 41, <br /> � �s <br /> . <br /> • <br /> Re-roof on Buildings:Clubhouse,6,7,8, i 0, 11, 14, 19, 20, 21,25, 26,Garages <br /> -Install new roofing from GAF <br /> -Flat roofs (Clubhouse) to receive new TPO roof,new metal flashings and accessories including cave and wall counter-flashings and meet FM <br /> Global requirements. <br /> -Install all new flashings per NRCA including pre-painted 8"x 8"step flashings, starter metal,drip edge and W valley metal <br /> -New soil pipes,ridge vent and AF-50 vents key matched to useful life of roof <br /> 200 l - 6 20 <br />