My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 8/3/2020 (2)
>
Contracts
>
6 Years Then Destroy
>
2025
>
Snohomish County 8/3/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:25:47 PM
Creation date
3/31/2021 11:53:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
8/3/2020
Council Approval Date
7/15/2020
End Date
8/3/2025
Department
Information Technology
Department Project Manager
Judie Shirley
Subject / Project Title
Information Technology Services
Tracking Number
0002842
Total Compensation
$85,948.70
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Snohomish County 4/30/2025 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A to Exhibit A <br /> SWO City of Everett Services List and Summary of Annual Costs <br /> SCDOIT will provide the following Services at the prepaid support rate identified below. <br /> Note:Access during normal business hours will be covered under the Network Equipment <br /> Hosting service. <br /> Network Services: <br /> 2020 Rates <br /> Services Function and Qty Activation Charge Monthly Annual <br /> Identification Date Each Charge charge <br /> Network Equipment Hosting Connectivity/Equipment 01/01/2009 $50.00 S600.00 <br /> 1 Rack Unit Space,first 4 Hosting <br /> cross connects <br /> Internet Access 1 Mbps via 95th Percentile 20 $19.00 380.00 $4,560.00 <br /> Administrative fees 5% $16.75 $258.00 <br /> Totals: S351.75 S5,418.00 <br /> Optional Support Services: <br /> Services Owner Function and Identification Date of Monthly Annual <br /> QtY Activation LOC Charge charge <br /> Additional Cross Connects Cross Connects 1/12009 SCDIS $25.00 <br /> Administrative fees 5% $1.25 <br /> Internet usage to be reviewed quarterly and Everett will be billed on the 95th percentile. <br /> SCDOIT uses RRDtool to graphically represent the customer's bandwidth and billing operations data on <br /> a monthly recurring basis. <br /> Bandwidth data is measured from the customer's activated network interface port on SCDOIT Internet <br /> colocation,gateway switch, and recorded in a log file every 1 minute.At the end of each month,the <br /> samples are sorted from highest to lowest,and the top 5%of bandwidth utilization data is discarded. The <br /> next highest measurement(95th percent)becomes the billable utilization for the month. <br /> These graphs will be made available upon customer request. See example chart below: <br /> Page 7 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.