Laserfiche WebLink
EVERETT HOUSING AUTHO <br /> ORITY EVERETT, WA <br /> Administrative Office Upgrades January 13, 2020 <br /> B. Door Hardware Schedule: Prepared by or under the supervision of Installer's Architectural <br /> Hardware Consultant. Coordinate door hardware schedule with doors, frames, and related <br /> work to ensure proper size, thickness, hand, function, and finish of door hardware. <br /> 1. Submittal Sequence: Submit door hardware schedule concurrent with submissions of <br /> Product Data, and Shop Drawings. Coordinate submission of door hardware schedule <br /> with scheduling requirements of other work to facilitate the fabrication of other work <br /> that is critical in Project construction schedule. <br /> 2. Format: Use same scheduling sequence and format and use same door numbers as in <br /> door hardware schedule in the Contract Documents. <br /> 3. Content: Include the following information: <br /> a. Identification number, location, hand, fire rating, size, and material of each door and <br /> frame. <br /> b. Location of each door hardware set cross-referenced to Drawings on floor plans and <br /> to door and frame schedule. <br /> c. Complete designations, including name and manufacturer, type, style, function, size, <br /> quantity, function, and finish of each door hardware product. <br /> d. Fastenings and other installation information. <br /> e. Explanation of abbreviations, symbols, and designations contained in door hardware <br /> schedule. <br /> f. Mounting locations for door hardware. <br /> g. List of related door devices specified in other Sections for each door and frame. <br /> C. Keying Schedule: Prepared by or under the supervision of Installer's Architectural <br /> Hardware Consultant, detailing Owner's final keying instructions for locks. Include <br /> schematic keying diagram and index each key set to unique door designations that are <br /> coordinated with the Contract Documents. <br /> 1.5 INFORMATIONAL SUBMITTALS <br /> A. Qualification Data: For Installer and Architectural Hardware Consultant. <br /> B. Maintenance Data: For each type of door hardware to include in maintenance manuals. <br /> Include final hardware and keying schedule. <br /> C. Sample Warranty: For special warranty. <br /> 1.6 CLOSEOUT SUBMITTALS <br /> A. Maintenance Data: For each type of door hardware to include in maintenance manuals. <br /> B. Schedules: Final door hardware and keying schedule. <br /> DOOR HARDWARE 087100 -2 <br />