Laserfiche WebLink
110 <br /> Everett Housing Authority <br /> Administrative Office Upgrades <br /> 03/24/20 <br /> Page 11 <br /> c. As noted above, the columns extend above the existing roof level to <br /> support the hoist beam. <br /> d, As noted above, the additional detail 11/550,01 has been added to <br /> show the connection between the rail and the roof, <br /> Sincerely, <br /> Kurt Nelson <br /> Architect <br /> Rice Fergus Miller, Inc. <br /> O il <br /> 1 <br />