Laserfiche WebLink
• S <br /> 2020 System Development Fee Calculations <br /> Permit #: B2005-043 Additional Notes: <br /> Project Address: 11030 EVERGREEN WAY Stormwater system development fees split on two separate permits: ground hard surfaces <br /> Project Name: CONVERT COMMON AREA MEETING ROOM INTO PACKAGE DELIVERY calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions (Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Thad Newport Date: 7/10/2020 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#; 0 ) Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br /> l �> Square Feet of New Plus Replaced Hard Surfaces: 242 SF <br /> Stormwater System Dev Fee: $61.93 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />